UNT Libraries Government Documents Department - 3,179 Matching Results

Search Results

open access

D-0 North End Cap Calorimeter Cold Test Results

Description: The North endcap calorimeter vessel was recieved on July 1, 1990. A cooldown of the pressure vessel with liquid nitrogen was performed on July 10-11 to check the vessel's integrity. With the pressure vessel cold, the insulating vacuum was monitored for leaks. Through out the testing, the insulating vacuum remained good and the vessel passed the test. The cold test was carried out per the procedures of D-Zero engineering note 3740.220-EN-250. The test was very similar to the cold test performed … more
Date: August 2, 1990
Creator: Michael, J.
open access

2-D Reflectometer Modeling for Optimizing the ITER Low-field Side Reflectometer System

Description: The response of a low-field side reflectometer system for ITER is simulated with a 2?D reflectometer code using a realistic plasma equilibrium. It is found that the reflected beam will often miss its launch point by as much as 40 cm and that a vertical array of receiving antennas is essential in order to observe a reflection on the low-field side of ITER.
Date: September 2, 2005
Creator: Kramer, G. J.; Nazikian, R.; Valeo, E. J.; Budny, R. V.; Kessel, C. & Johnson, D.
open access

3 GeV Booster Synchrotron Conceptual Design Report

Description: Synchrotron light cna be produced from a relativistic particle beam circulating in a storage ring at extremely high intensity and brilliance over a large spectral region reaching from the far infrared regime to hard x-rays. The particles, either electrons or positrons, radiate as they are deflected in the fields of the storage ring bending magnets or of magnets specially optimized for the production of synchrotron light. The synchrotron light being very intense and well collimated in the forwar… more
Date: June 2, 2009
Creator: Wiedemann, Helmut
open access

100 Area Process Water Pressure Decay Test Program: Part 1

Description: The increase in process tube outlet water temperature to 90{degree}C resulted in increased emergency water flow requirements as indicated by recently approved curves which establish minimum crossheader pressure requirements for the first three minutes following an electrical power failure. To determine whether 190 Building secondary process water pump capacities are adequate for current minimum reactor water pressure requirements, process water pump trip-cut tests are being conducted at all rea… more
Date: January 2, 1953
Creator: Thompson, P.
open access

100 Areas engineers technical activities report, December 1950

Description: Plant Assistance Group summaries are given for the B, D, F, H, and DR piles. The Engineering Development Group reports on: ball 3-X program, special field instruments, pile flux density measurements, magnesium inlet dummies, assistance to pile physics group, water survey program, boiling studies, slug temperature measurements, and the job status report for engineering development.
Date: January 2, 1951
open access

100 Areas, July 23 through July 29. For technical progress letter number 108

Description: The weekly progress for D and F piles is given. Status of the test to determine the cause of white deposits on the horizontal control rods of the F pile is given. Also discussed are studies of process water control and pressure drop, corrosion, and graphite expansion. Test results indicate that graphite expansion has not seriously limited discharge of process tubes.
Date: August 2, 1946
Creator: Jordan, W. E.
open access

100 Areas technical activities report Engineers, January 1951

Description: Monthly reports are given for the B, D, DR, F and H piles. And the Engineering Development Group reports on the: Ball 3-X program, thermocouple slug irradiation and related studies, process water study, metallurgical and corrosion studies, analytical research, heat transfer and temperature effect experiment, assistance to pile physics group, miscellaneous development projects, and a job status report from Engineering Development.
Date: February 2, 1951
open access

105 K-West isolation barrier leak recovery plan

Description: Leak testing is being performed in 105 KW to verify the performance of the isolation barriers which have been recently installed. When an 11 inch differential head is established between the main basin and the discharge chute, a leak-rate of approximately 30 - 35 gpm is observed. The leak-rate would be achieved by a 1.65`` - 2`` diameter hole (or equivalent). Analyses suggest that the flow is turbulent/laminar transitional (dominantly turbulent), which would be indicative of a single point leak… more
Date: March 2, 1995
Creator: Wiborg, J.C.
open access

105-N charge-discharge rates

Description: Figures have and can be generated that indicate a higher charge-discharge rate if required before 105-N will be comparable with existing reactors. Also, these figures show an apparent operating cost incentive to increase the charge-discharge rates proposed for 105-N. Although these figures may be true by themselves, other figures developed from the same information and stated on a basis that affords a true comparison, show that the proposed rates for 105-N are compatible with those in existing … more
Date: July 2, 1959
Creator: Nesbitt, J. F.
open access

183 B-C cross tie justification and scope

Description: After the present solid slugs are replaced with the new I&E elements` in the 105-B reactor, the friction loss for the reactor cooling water will be decreased with a resulting opportunity for increase in flow through the reactor. The amount that this flow could be increased is limited by the capacity of the B water plant as well as the reactor itself. It is possible that there will be a shortage of filtered water at 183-B during the critical periods of each year. To overcome this possible shorta… more
Date: December 2, 1957
Creator: Brinkman, L. B.
open access

200 Area treated effluent disposal facility operational test specification

Description: This document identifies the test specification and test requirements for the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These operational testing activities, when completed, demonstrate the functional, operational and design requirements of the 200 Area TEDF have been met.
Date: February 2, 1995
Creator: Crane, A. F.
open access

241-SY-101 mulitport riser acceptance for beneficial use

Description: This document formally demonstrates that the Acceptance for Beneficial USE (ABU) process for the SY tank farm Multiport Riser assembly has been properly completed in accordance with the ABU checklist. For each item required on the ABU checklist, a bibliography of the documentation prepared and released to satisfy the requirement is provided
Date: October 2, 1995
Creator: Mendoza, R.E.
open access

241-SY-101 multi-functional instrument tree acceptance for beneficial use (ABU)

Description: This document formally demonstrates that the ABU process for the 241-SY-101 risers 17B and 17C Multi-functional Instrument Trees (MIT`s) has been properly completed in accordance with the approved ABU checklists. For each item required on the ABU Checklist, a bibliography of the documentation prepared and released to satisfy the requirements is provided. Release of this documentation signifies that the tank farm Operations, Engineering, and Maintenance organizations have accepted responsibility… more
Date: October 2, 1995
Creator: Erhart, M.F.
open access

324 Building safety basis criteria document

Description: The Safety Basis Criteria document describes the proposed format, content, and schedule for the preparation of an updated Safety Analysis Report (SAR) and Operational Safety Requirements document (OSR) for the 324 Building. These updated safety authorization basis documents are intended to cover stabilization and deactivation activities that will prepare the facility for turnover to the Environmental Restoration Contractor for final decommissioning. The purpose of this document is to establish … more
Date: June 2, 1999
Creator: STEFFEN, J.M.
open access

1998 Comprehensive TNX Area Annual Groundwater and Effectiveness Monitoring Report

Description: Shallow groundwater beneath the TNX Area at the Savannah River Site has been contaminated with chlorinated volatile organic compounds such as trichloroethylene and carbon tetrachloride. The Interim Action T-1 Air Stripper System began operation on September 16, 1996. A comprehensive groundwater monitoring program was initiated to measure the effectiveness of the system. The Interim Action is meeting its objectives and is capable of continuing to do so until the final groundwater remedial action… more
Date: June 2, 1999
Creator: Chase, J.
open access

1998 interim 242-A Evaporator tank system integrity assessment report

Description: This Integrity Assessment Report (IAR) is prepared by Fluor Daniel Northwest (FDNW) under contract to Lockheed-Martin Hanford Company (LMHC) for Waste Management Hanford (WMH), the 242-A Evaporator (facility) operations contractor for Fluor Daniel Hanford, and the US Department of Energy, the system owner. The contract specifies that FDNW perform an interim (5 year) integrity assessment of the facility and prepare a written IAR in accordance with Washington Administrative Code (WAC) 173-303-640… more
Date: July 2, 1998
Creator: Jensen, C.E.
open access

1998 Tier two emergency and hazardous chemical inventory - emergency planning and community right-to-know act section 312

Description: The Hanford Site covers approximately 1,450 square kilometers (560 square miles) of land that is owned by the U.S, Government and managed by the U.S. Department of Energy, Richland Operations Office (DOE-RL). The Hanford Site is located northwest of the city of Richland, Washington. The city of Richland adjoins the southeastern portion of the Hanford Site boundary and is the nearest population center. Activities on the Hanford Site are centralized in numerically designated areas. The 100 Areas,… more
Date: March 2, 1999
Creator: ZALOUDEK, D.E.
open access

2003 Brookhaven National Laboratory Annual Illness and Injury Surveillance Report, Revised September 2007

Description: Annual Illness and Injury Surveillance Program report for 2003 for Brookhaven National Lab. The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The IISP monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. more
Date: October 2, 2007
Creator: United States. Department of Energy. Office of Illness and Injury Prevention Programs.
open access

2009 Wind Technologies Market Report

Description: This report addresses the U.S. wind power industry during the year of 2009.
Date: August 2, 2010
Creator: Wiser, Ryan & Bolinger, Mark
open access

The 2010 Oil Spill: MMS/BOEMRE and NEPA

Description: This report reviews the environmental procedures required following the explosion of an oil well on a tract leased by BP from the federal government.
Date: March 2, 2011
Creator: Alexander, Kristina
Back to Top of Screen