UNT Libraries Government Documents Department - 721 Matching Results

Search Results

open access

9-ANGIE : a Two-Dimensional, Multigroup, Neutron-Diffusion-Theory Reactor Code for the IBM 709 or 7090

Description: The 9-ANGIE, one of a series of reactor neutronic programs for an IBM 709 or 7090 data processing system, solves the time-dependent, multi-group, neutron diffusion equation for one to eighteen energy groups applied to a rectangular mesh superimposed on either an x-y or an r-z plane. It is characterized by its generalities in region description, boundary conditions, etc., without sacrificing simplicity of input preparation and ease of machine operation. The notation, the style, and the format ha… more
Date: October 28, 1960
Creator: Stone, Stuart P.
open access

100-N Decontamination Facility Design Guide.

Description: Space has been reserved near the southeast corner of the 100-N Area for the 122-N Decontamination Facility. Previous correspondence between Burns and Roe, Inc and General Electric bae discussed various facilities which might be needed in the building. The concepts of the decontamination processes are under active development by research groups at Hanford. At present, there are several workable processes known; each one has one or more fairly serious drawbacks.
Date: March 8, 1960
Creator: Bainard, W. D.
open access

568 Report

Description: Final report for a grant contract documenting information about the scope of the project and results.
Date: 1960
Creator: Pollard, Ernest C. (Ernest Charles), 1906-1997
open access

The 1958 He4 Scale of Temperatures: Part 1. Introduction, Part 2. Tables for the 1958 Temperature Scale

Description: Report containing information regarding He4 vapor pressure measurement as of 1958, the recent history of the vapor pressure temperature scale, and a series of tables containing these measurements.
Date: June 17, 1960
Creator: Brickwedde, F. G. (Ferdinand Graft), 1903-; van Dijk, H.; Durieux, M.; Clement, J. R. & Logan, J. K.
open access

ABWR: PL-2 Design Report

Description: From preface: This report satisfies the quarterly progress report requirements for PL-1 and PL-2 plant design work for the period ending September 30, 1960 At present time a SL-1 Core 2 is under construction. This is a replacement core for SL-1 (ALPR) and will be identical to a PL-2 core; a PL condenser is under test at the SL-1 facility; final construction plans for PL components and modules which are not site sensitive will be completed in March 1961.
Date: October 15, 1960
Creator: Combustion Engineering, inc. Nuclear Division.
open access

Additional Miscellaneous Tools in the HRT Core

Description: This memorandum presents a description of several additional miscellaneous HRT core maintenance tools, not in an earlier report (1). These tools were used in the removal of the cut up diffuser plates, probing the core wall, gauging the size of the holes, and other simple tasks. Function, design, and operation are described for the following items.
Date: September 26, 1960
Creator: Holz, P. P.
open access

Adsorption of Radioactive Gases on Activated Carbon

Description: The purpose of this experiment is to study the quantitative adsorption characteristics of a carbon adsorber bed receiving a radioactive inert gas in a helium stream. An objective of the experiment is to measure the equilibrium transmission of the radio-active gas through a carbon adsorber in order to determine if radio-active decay of the adsorbed gas permits additional adsorption.
Date: August 31, 1960
Creator: Madey, Richard; Barker, J. J.; Beebe, M. R. & Stephenson, T. E.
open access

AEC Group Shelter

Description: Report regarding the study of an underground group-shelter meant to protect against nuclear blasts, radiation, and fallout. The report presents a design for such a shelter, the minimum requirements that such a shelter should meet, a description of its facilities, illustrations, and an operating manual.
Date: January 1960
Creator: Holmes & Narver
open access

An Aerodynamic Raindrop Sorter. Technical Progress Report No. 1.

Description: A pilot model of an Aerodynamic Raindrop Sorter was constructed along the lines suggested by mathematical analysis. The function of the analyzer is to sort natural rain according to drop size and to collect the sorted drops for further analysis. The pilot model, a small wind tunnel inclined at 45 deg to the horizontal, demonstrated the feasibility of aerodynamic rain drop sorting over a wide range of drop sizes. (auth)
Date: January 1960
Creator: Dingle, A. Nelson & Brock, Fred V.
open access

After Shutdown Heating in the HFIR

Description: After shutdown heating rates have been calculated for the target, control plates, and the beryllium reflector of the HFIR. Hilvety previously calculated the after shutdown heating rates in the element and his results are reported in ORNL CP-60-4-110. Decay times of 1.0 10, 10^2, 10^3, 10^4, and 10^5 seconds have been considered, and heat fluxes have been computed for all of the mentioned components. The greatest heat fluxes were found to be at the surfaces of the control plates and the permanen… more
Date: December 29, 1960
Creator: McLain, H. A.
open access

An Algorithm for Construction Feasible Schedules and Computing Their Schedule Times

Description: "An algorithm for the generation of feasible schedules and the computation of the completion times of the job operations of feasible schedule is presented. Using this algorithm, the distribution of schedule times over the set of feasible schedule—or a subset of feasible schedules—was determined for technological orderings that could occur in a general machine shop. These distributions are found to be approximately normal. Biasing techniques corresponding to “first come first serve,” random choi… more
Date: November 15, 1960
Creator: Heller, Jack & Logemann, George
open access

Aluminum Alloy Work at Hanford

Description: Investigation of aqueous and steam corrosion at elevated temperature has been carried on at Hanford for several tears. A number of reports have been published on various phases of the corrosion program but, except for monthly reports, little has been written on the progress of the Corrosion and Coatings Operation alloy development program. This interim report will outline the more important current phases of the aluminum alloy program.
Date: May 6, 1960
Creator: Bowen, H. C.
Back to Top of Screen