From preface: This report satisfies the quarterly progress report requirements for PL-1 and PL-2 plant design work for the period ending September 30, 1960 At present time a SL-1 Core 2 is under construction. This is a replacement core for SL-1 (ALPR) and will be identical to a PL-2 core; a PL condenser is under test at the SL-1 facility; final construction plans for PL components and modules which are not site sensitive will be completed in March 1961.
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
From preface: This report satisfies the quarterly progress report requirements for PL-1 and PL-2 plant design work for the period ending September 30, 1960 At present time a SL-1 Core 2 is under construction. This is a replacement core for SL-1 (ALPR) and will be identical to a PL-2 core; a PL condenser is under test at the SL-1 facility; final construction plans for PL components and modules which are not site sensitive will be completed in March 1961.
This report is part of the following collection of related materials.
Technical Report Archive and Image Library
The Technical Report Archive & Image Library (TRAIL) identifies, acquires, catalogs, digitizes and provides unrestricted access to U.S. government agency technical reports. The mission of TRAIL is to ensure preservation, discoverability, and persistent open access to government technical publications regardless of form or format.
Combustion Engineering, inc. Nuclear Division.ABWR: PL-2 Design Report,
report,
October 15, 1960;
Oak Ridge, Tennessee.
(https://digital.library.unt.edu/ark:/67531/metadc957867/:
accessed October 3, 2024),
University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu;
crediting UNT Libraries Government Documents Department.