UNT Libraries Government Documents Department - 69,053 Matching Results

Search Results

Primary view of D-0 End Calorimeter Warm Tube/TeV Dry Air Purge
Leibfritz, J. R.
August 14, 1991
Primary view of D-0 North End Cap Calorimeter Cold Test Results
Michael, J.
August 2, 1990
Primary view of D-0 South End Cap Calorimeter Cold Test Results
Rucinski, R.
November 26, 1990
Primary view of A 1. 5--4 Kelvin detachable cold-sample transfer system: Application to inertially confined fusion with spin-polarized hydrogens fuels
Alexander, N.; Barden, J.; Fan, Q. & Honig, A.
January 1, 1990
Primary view of 1.8.2.1.2 Site system engineering implementation Fiscal Year 1998 multi-year work plan
Ferguson, J. E.
October 3, 1997
Primary view of 1.8.3 Site system engineering FY 1997 program plan
Grygiel, M. L.
September 13, 1996
Primary view of 1/12-Scale mixing interface visualization and buoyant particle release tests in support of Tank 241-SY-101 hydrogen mitigation
Eschbach, E. J. & Enderlin, C. W.
October 1, 1993
Primary view of 1/12-scale physical modeling experiments in support of tank 241-SY- 101 hydrogen mitigation
Fort, J. A.; Bamberger, J. A.; Bates, J. M.; Enderlin, C. W. & Elmore, M. R.
January 1, 1993
Primary view of 1/12-scale physical modeling experiments in support of tank 241-SY- 101 hydrogen mitigation. Final report
Fort, J. A.; Bamberger, J. A.; Bates, J. M.; Enderlin, C. W. & Elmore, M. R.
January 1993
Primary view of 1/12-Scale scoping experiments to characterize double-shell tank slurry uniformity: Test plan
Bamberger, J. A. & Liljegren, L. M.
October 1994
Primary view of 1-Dimensional simulation of thermal annealing in a commercial nuclear power plant reactor pressure vessel wall section
Nakos, J. T.; Rosinski, S. T. & Acton, R. U.
November 1, 1994
Primary view of A 1-kW power demonstration from the advanced free electron laser
Sheffield, R. L.; Conner, C. A. & Fortgang, C. M.
August 1997
Primary view of 1: Mass asymmetric fission barriers for {sup 98}Mo; 2: Synthesis and characterization of actinide-specific chelating agents
Veeck, A. C.
August 1, 1996
Primary view of A-01 metals in stormwater runoff evaluation
Eldridge, L. L.
November 6, 1997
Primary view of 1. Mono((8)annulene)Uranium(4) half-sandwich complexes, 2. Novel syntheses of symmetrically substituted cyclooctatetetraenes
Boussie, T. R.
October 1, 1991
Primary view of 2-1/2-D electromagnetic modeling of nodular defects in high-power multilayer optical coatings
Molau, N. E.; Brand, H. R.; Kozlowski, M. R. & Shang, C. C.
July 1996
Primary view of (02.2) Scoping experiments; (02.3) long-term corrosion testing and properties evaluation of candidate waste package basket material
VanKonynenburg, R. A.
December 20, 1996
Primary view of The 2.3 {angstrom} crystal structure of cholera toxin B subunit pentamer: Choleragenoid
Zhang, Rong-Guang; Westbrook, M. L.; Maulik, P. R.; Reed, R. A.; Shipley, G.; Westbrook, E. M. et al.
February 1, 1996
Primary view of 2-D image segmentation using minimum spanning trees
Xu, Y. & Uberbacher, E. C.
September 1995
Primary view of A 2-D imaging heat-flux gauge
Noel, B.W.; Borella, H.M. (Los Alamos National Lab., NM (United States)); Beshears, D.L.; Sartory, W.K.; Tobin, K.W.; Williams, R.K. (Oak Ridge National Lab., TN (United States)) et al.
July 1, 1991
Primary view of 2-D linear motion system. Innovative technology summary report
unknown creator
November 1, 1998
Primary view of 2 Hz, 30 T Split Pulse Water Cooled Magnet for Neutron Scattering Experiments (Materials Characterization and Design Options)
Eyssa, Y. M.; Walsh, R. P.; Miller, J. R.; Miller, G. E.; Pernambuco-Wise, P.; Bird, M. D. et al.
August 26, 1997
Primary view of 2 MV Injector as the Elise Front-End and as an Experimental Facility
Yu, S. S.; Eylon, S.; Henestroza, E.; Peters, C.; Reginato, L.; Tauschwitz, A. et al.
December 7, 1999
Primary view of 3-D computer simulations of EM fields in the APS vacuum chamber: Part 1, Frequency-domain analysis
Chou, W. & Bridges, J.
September 4, 1990
Back to Top of Screen