UNT Libraries Government Documents Department - 13,301 Matching Results

Search Results

open access

0.7-eV GaInAs Junction for a GaInP/GaAs/GaInAs(1-eV)/GaInAs(0.7-eV) Four-Junction Solar Cell: Preprint

Description: We discuss recent developments in III-V multijunction solar cells, focusing on adding a fourth junction to the Ga0.5In0.5P/GaAs/Ga0.75In0.25As inverted three-junction cell. This cell, grown inverted on GaAs so that the lattice-mismatched Ga0.75In0.25As third junction is the last one grown, has demonstrated 38% efficiency, and 40% is likely in the near future. To achieve still further gains, a lower-bandgap GaxIn1-xAs fourth junction could be added to the three-junction structure for a four-junc… more
Date: May 1, 2006
Creator: Friedman, D. J.; Geisz, J. F.; Norman, A. G.; Wanlass, M. W. & Kurtz, S. R.
open access

1-MeV-Electron Irradiation of GaInAsN Cells: Preprint

Description: This conference paper describes the GaInAsN cells that are measured to retain 933% and 894% of their original efficiency after exposure to 5 X 1014 and 1 X 1015 cm-2 1-MeV electrons, respectively. The rate of degradation is not correlated with the performance at beginning of life (BOL). The depletion width remains essentially unchanged, increasing by< 1%. Temperature-coefficient data for GaInAsN cells are also presented. These numbers are used to project the efficiency of GaInAsN-containing … more
Date: May 1, 2002
Creator: Kurtz, Sarah; King, R. R.; Edmondson, K. M.; Friedman, D. J. & Karam, N. H.
open access

1 mil gold bond wire study.

Description: In microcircuit fabrication, the diameter and length of a bond wire have been shown to both affect the current versus fusing time ratio of a bond wire as well as the gap length of the fused wire. This study investigated the impact of current level on the time-to-open and gap length of 1 mil by 60 mil gold bond wires. During the experiments, constant current was provided for a control set of bond wires for 250ms, 410ms and until the wire fused; non-destructively pull-tested wires for 250ms; and … more
Date: May 1, 2013
Creator: Huff, Johnathon; McLean, Michael B.; Jenkins, Mark W. & Rutherford, Brian Milne
open access

A 2--4 nm Linac Coherent Light Source (LCLS) using the SLAC linac

Description: We describe the use of the SLAC linac to drive a unique, powerful. short wavelength Linac Coherent Light Source (LCLS). Operating as an FEL, lasing would be achieved in a single pass of a high peak current electron beam through a long undulator by self-amplified spontaneous emission (SASE). The main components are a high-brightness rf photocathode electron gun; pulse compressors; about 1/5 of the SLAC linac; and a long undulator with a FODO quadrupole focussing system. Using electrons below 8 G… more
Date: May 1, 1993
Creator: Winick, H.; Bane, K. & Boyce, R.
open access

2 {times} 2 TeV {mu}{sup +}{mu}{sup {minus}} collider: Lattice and accelerator-detector interface study

Description: The design for a high-luminosity {mu}{sup +}{mu}{sup {minus}} superconducting storage ring is presented based on first-pass calculations. Special attention is paid to two Iowa interaction regions (IR) whose optics are literally interlaced with the collider detectors. Various sources of backgrounds in IR are explored via realistic Monte Carlo simulations. An improved design of the collider lattice in the neighborhood of the interaction points (EP) is determined by the need to reduce significantl… more
Date: May 1, 1995
Creator: Gelfand, N. M. & Mokhov, N. V.
open access

3-D Ray-tracing and 2-D Fokker-Planck Simulations of Radiofrequency Application to Tokamak Plasmas

Description: A state of the art numerical tool has been developed to simulate the propagation and the absorption of coexisting different types of waves in a tokamak geometry. The code includes a numerical solution of the three-dimensional (R, Z, {Phi}) toroidal wave equation for the electric field of the different waves in the WKBJ approximation. At each step of integration, the two-dimensional (v{sub {parallel}}, v{sub {perpendicular}}) Fokker-Planck equation is solved in the presence of quasilinear diffus… more
Date: May 1, 1999
Creator: Cardinali, A.; Paoletti, F. & Bernabei, S.
open access

3-D treatment of convective flow in the earth's mantle

Description: A three-dimensional finite-element method is used to investigate thermal convection in the earth's mantle. The equations of motion are solved implicitly by means of a fast multigrid technique. The computational mesh for the spherical problem is derived from the regular icosahedron. The calculation described use a mesh with 43,554 nodes and 81,920 elements and were run on a Cray X. The earth's mantle is modeled as a thick spherical shell with isothermal, free-slip boundaries. The infinite Prandt… more
Date: May 1, 1984
Creator: Baumgardner, J.R.
open access

A 3 TeV Muon Collider Lattice Design

Description: A new lattice for 3 TeV c.o.m. energy with {beta}* = 5mm was developed which follows the basic concept of the earlier 1.5 TeV design but uses quad triplets for the final focus in order to keep the maximum magnet strength and aperture close to those in 1.5 TeV case. Another difference is employment of combined-function magnets with the goal to lower heat deposition in magnet cold mass and to eliminate bending field free regions which produce 'hot spots' of neutrino radiation that can be an issue… more
Date: May 1, 2012
Creator: Alexahin, Y. & Gianfelice-Wendt, E.
open access

4. pi. data of relativistic nuclear collisions. [Plastic ball]

Description: During the past two years, complete events of relativistic nuclear collisions are being studied with the Plastic Ball, the first electronic nonmagnetic particle-identifying 4..pi.. spectrometer. It is well suited to handle the large multiplicities in these reactions and allows collection of data at a rate sufficient to make further software selections to look at rare events. The analysis of the data follows various lines covering topics like thermalization, stopping or transparency, cluster-pro… more
Date: May 1, 1983
Creator: Gutbrod, H.H.; Gustafsson, H.A. & Kolb, B.
open access

5 K neutron irradiation and thermal cycling of NbTi superconductors

Description: Simulation experiments of magnet operating conditions in a fusion reactor are reported. After approximately half of the lifetime dose the results on a variety of NbTi superconductors show moderate changes of the critical current density j/sub c/ (approx. 10%), the percentage change of j/sub c/ is always larger at high fields (8 T) than at 5 T. After a rapid initial change the resistivity ratios of the Cu-stabilizer are found to decrease only slowly with increasing neutron fluence.
Date: May 1, 1984
Creator: Hahn, P.; Hoch, H.; Weber, H. W.; Birtcher, R. C. & Brown, B. S.
open access

6. 4 Tesla dipole magnet for the SSC

Description: A design is presented for a dipole magnet suitable for the proposed SSC facility. Test results are given for model magnets of this design 1 m long and 4.5 m long. Flattened wedge-shaped cables (''keystoned'') are used in a graded, two-layer ''cos theta'' configuration with three wedges to provide sufficient field uniformity and mechanical rigidity. Stainless steel collars 15 mm wide, fastened with rectangular keys, provide structural support, and there is a ''cold'' iron flux return. The outer-… more
Date: May 1, 1985
Creator: Taylor, C.E.; Caspi, S.; Gilbert, W.; Meuser, R.; Mirk, K.; Peters, C. et al.
open access

6 Batch Injection and Slipped Beam Tune Measurements in Fermilab?s Main Injector

Description: During NOVA operations it is planned to run the Fermilab Recycler in a 12 batch slip stacking mode. In preparation for this, measurements of the tune during a six batch injection and then as the beam is decelerated by changing the RF frequency have been carried out in the Main Injector. The coherent tune shifts due to the changing beam intensity were measured and compared well with the theoretically expected tune shift. The tune shifts due to changing RF frequency, required for slip stacking, a… more
Date: May 1, 2012
Creator: Scott, D. J.; Capista, D.; Kourbanis, I.; Seiya, K. & Yan, M.-J.
open access

7-GeV advanced photon source beamline initiative: Conceptual design report

Description: The DOE is building a new generation 6-7 GeV Synchrotron Radiation Source known as the Advanced Photon Source (APS) at Argonne National Laboratory. This facility, to be completed in FY 1996, can provide 70 x-ray sources of unprecedented brightness to meet the research needs of virtually all scientific disciplines and numerous technologies. The technological research capability of the APS in the areas of energy, communications and health will enable a new partnership between the DOE and US indus… more
Date: May 1, 1993
open access

8 GeV H- ions: Transport and injection

Description: Fermilab is working on the design of an 8 GeV superconducting RF H{sup -} linac called the Proton Driver. The energy of H{sup -} beam will be an order of magnitude higher than the existing ones. This brings up a number of technical challenges to transport and injection of H{sup -} ions. This paper will focus on the subjects of stripping losses (including stripping by blackbody radiation, field and residual gas) and carbon foil stripping efficiency, along with a brief discussion on other issues … more
Date: May 1, 2005
Creator: Chou, W.; Bryant, H.; Drozhdin, A.; Hill, C.; Kostin, M.; Macek, R. et al.
open access

A 10,000 A 1000 VDC solid state dump switch

Description: The superconducting magnet test program at Fermilab requires a switch, called a dump switch, rated 10,000 A, 1000 Vdc, which must be able to continuously carry rated current. A dump resistor rated 2 MJoules, is connected in parallel with the switch contacts and dissipates the stored energy from a magnet when the switch opens. The required switch opening time is 250 {mu}sec maximum after detection of a fault or a trip command. A successful switch can be constructed from six parallel inverter typ… more
Date: May 1, 1991
Creator: Visser, A.
open access

10 CFR 830 Major Modification Determination for Advanced Test Reactor LEU Fuel Conversion

Description: The Advanced Test Reactor (ATR), located in the ATR Complex of the Idaho National Laboratory (INL), was constructed in the 1960s for the purpose of irradiating reactor fuels and materials. Other irradiation services, such as radioisotope production, are also performed at ATR. The ATR is fueled with high-enriched uranium (HEU) matrix (UAlx) in an aluminum sandwich plate cladding. The National Nuclear Security Administration Global Threat Reduction Initiative (GTRI) strategic mission includes eff… more
Date: May 1, 2012
Creator: Christensen, Boyd D.; Lehto, Michael A. & Duckwitz, Noel R.
open access

10 CFR 830 Major Modification Determination for Advanced Test Reactor RDAS and LPCIS Replacement

Description: The replacement of the ATR Control Complex's obsolete computer based Reactor Data Acquisition System (RDAS) and its safety-related Lobe Power Calculation and Indication System (LPCIS) software application is vitally important to ensure the ATR remains available to support this national mission. The RDAS supports safe operation of the reactor by providing 'real-time' plant status information (indications and alarms) for use by the reactor operators via the Console Display System (CDS). The RDAS … more
Date: May 1, 2012
Creator: Korns, David E.
open access

10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement

Description: The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were v… more
Date: May 1, 2011
Creator: Duckwitz, Noel
open access

10 CFR 830 Major Modification Determination for Replacement of ATR Primary Coolant Pumps and Motors

Description: The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were v… more
Date: May 1, 2011
Creator: Duckwitz, Noel
open access

10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement

Description: Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100… more
Date: May 1, 2011
Creator: Duckwtiz, Noel
open access

13 point video tape quality guidelines

Description: Until high definition television (ATV) arrives, in the U.S. we must still contend with the National Television Systems Committee (NTSC) video standard (or PAL or SECAM-depending on your country). NTSC, a 40-year old standard designed for transmission of color video camera images over a small bandwidth, is not well suited for the sharp, full-color images that todays computers are capable of producing. PAL and SECAM also suffers from many of NTSC`s problems, but to varying degrees. Video professi… more
Date: May 1, 1997
Creator: Gaunt, R.
open access

20% Wind Energy - Diversifying Our Energy Portfolio and Addressing Climate Change (Brochure)

Description: This brochure describes the R&D efforts needed for wind energy to meet 20% of the U.S. electrical demand by 2030. In May 2008, DOE published its report, 20% Wind Energy by 2030, which presents an in-depth analysis of the potential for wind energy in the United States and outlines a potential scenario to boost wind electric generation from its current production of 16.8 gigawatts (GW) to 304 GW by 2030. According to the report, achieving 20% wind energy by 2030 could help address climate cha… more
Date: May 1, 2008
open access

26 - LMFBR flexible pipe joint development

Description: Objective is the qualification of a PLBR-size primary loop flexible piping joint to the ASME Band PVC rules. Progress and activities are reported for: Class 1 flexible joint code approval support, engineering and design, material development, component testing, and manufacturing development. (DLC)
Date: May 1, 1978
Creator: Anderson, R.V.
Back to Top of Screen