Search Results

Primary view of The Determination of Uranyl Nitrate in Pretreated Hexone by Infrared Absorption Measurements
Moore, R. H.
April 20, 1950
Primary view of Ferrous Sulfamate Stability in the RA System
Clagett, Fred
April 20, 1950
Primary view of Apparent viscosity of simulated underground metal waste slurries
Allen, A. W.
June 20, 1950
Primary view of Properties and Settling Rates of 101-U Sludge-Supernate Slurries
Frame, J. M.
June 20, 1950
Primary view of The Effect of the Speed of Emission on the Rise of a Plume of Stack Gases
Barad, M. L.
November 20, 1950
Primary view of Analytical procedures for the metal fabrication process
Leboeuf, M. B.
February 20, 1951
Primary view of Purex Pulse-Column Studies With Unirradiated Uranium: (Development of Specifications for the O.R.N.L. Pilot Plant)
Bradley, J. G.
February 20, 1951
Primary view of Kinetics of Plutonium Reduction in the Redox IB Column
Moore, Robert Lee
March 20, 1951
Primary view of An Infrared Absorption Method for TBP After Extraction from an Aqueous Phase
Moore, R. H. & Brite, D. W.
September 20, 1951
Primary view of Corrosion of Stainless Steel Type 309SCB in 200 Area Dissolver Solution Containing Mercuric Ion
Sanborn, K. L.
December 20, 1951
Primary view of Densitometric Determination of Iron in Plutonium
Daniel, J. L.
December 20, 1951
Primary view of Guide to Application of the X-ray Photometer in Chemical Analysis
Lambert, Maurice C.
June 20, 1952
Primary view of Monitoring Survey : Richland to Arco, Period May 9-11, 1952
Honstead, J. F.
June 20, 1952
Primary view of The Analysis of TBP Process Streams for Calcium with the Flame Photometer
Brite, D. W.
February 20, 1953
Primary view of Preliminary Results of the Ratio of PU²³⁹ Fission Cross Section to U²³⁵ Fission Cross Section
Leonard, B. R.
February 20, 1953
Primary view of Ground Level Concentrations in the Vicinity of a 185 ft Stack
Shorr, B.
April 20, 1953
Primary view of Effect of Process Variables on Graphite Purity
Riley, W. C. & Corners, A. M.
July 20, 1954
Primary view of Addendum to Report HW-30390:  Estimated Power Generation in MTR Slug Test Facility
Neumann, Hans, 1936-
September 20, 1954
Primary view of An Automatic Water Deaeration System
Raymond, J. R.
April 20, 1959
Primary view of Corrosion of 2R-2 and 304 Stainless Steel Following the Turco-4501 Decontamination Process.
Larrick, A. P. & Lotsinger, R. J.
April 20, 1959
Primary view of PRTR Gas-Cooled Loop, Hazards Survey of Preliminary Scope Design
Wittenbrock, N. G.
April 20, 1959
Primary view of Parameters of Dissolver Equipment Design - Power Fuel Reprocessing
Graf, W. A.
May 20, 1959
Primary view of 709 Program for Reduction of Exponential Pile Data
Matsumoto, D. D.
August 20, 1959
Primary view of Techniques for Estimating the Specific Retention Properties of Hanford Soils
Bierschenk, William H.
August 20, 1959
Back to Top of Screen