UNT Libraries Government Documents Department - 6,022 Matching Results

Search Results

Primary view of $D^0 \bar{D}^0$ Mixing at BaBar
Coleman, Jonathon
October 26, 2011
Primary view of D-0 South End Cap Calorimeter Cold Test Results
Rucinski, R.
November 26, 1990
Primary view of 1-/sup 11/C-D-glucose and related compounds
Shiue, Chyng-Yann & Wolf, Alfred P.
January 26, 1982
Primary view of 2 Hz, 30 T Split Pulse Water Cooled Magnet for Neutron Scattering Experiments (Materials Characterization and Design Options)
Eyssa, Y. M.; Walsh, R. P.; Miller, J. R.; Miller, G. E.; Pernambuco-Wise, P.; Bird, M. D. et al.
August 26, 1997
Primary view of A 3-D hydrodynamic dispersion model for modeling tracer transport in Geothermal Reservoirs
Wu, Yu-Shu & Pruess, Karsten
January 26, 1998
Primary view of 04-ERD-052-Final Report
Loots, G. G.; Ovcharenko, I.; Collette, N.; Babu, P.; Chang, J.; Stubbs, L. et al.
February 26, 2007
Primary view of 5 kWe reactor power distributions
Bost, D.S.
June 26, 1972
Primary view of The “8(a) Program” for Small Businesses Owned and Controlled by the Socially and Economically Disadvantaged: Legal Requirements and Issues
Manuel, K. M.
November 26, 2014
Primary view of 9-11 Commission Hearing #7, January 26, 2004, Part 1
National Commission on Terrorist Attacks upon the United States
January 26, 2004
Primary view of 9-11 Commission Hearing #7, January 26, 2004, Part 2
National Commission on Terrorist Attacks upon the United States
January 26, 2004
Primary view of 9-11 Commission Hearing #7, January 26, 2004, Part 3
National Commission on Terrorist Attacks upon the United States
January 26, 2004
Primary view of 9-11 Commission Hearing #7, January 26, 2004, Part 4
National Commission on Terrorist Attacks upon the United States
January 26, 2004
Primary view of 11.424 Ghz Stripline Transversal Filter for Sub-Picosecond Bunch Timing Measurements
Van Winkle, D.; Young, A. & Fox, J. D.
August 26, 2010
Primary view of A 15-T Pulsed Solenoid for a High-Power Target Experiment
Kirk, H. G.; Efthymiopoulos, I.; Fabich, A.; Haug, R.; Titus, P.; McDonald, K. T. et al.
June 26, 2006
Primary view of A 37,500 KW Power Reactor with Competitive Possibilities
Thompson, W. I. & Cohen, Karl
February 26, 1954
Primary view of 40-MW(E) PROTOTYPE HIGHTEMPERATURE GAS-COOLED REACTOR. POST CONSTRUCTION RESEARCH AND DEVELOPMENT PROGRAM. Quarterly Progress Report for Period Ending January 31, 1965
unknown creator
February 26, 1965
Primary view of 90-Ton Triple Cylinder Jack Design
Jaques, Al
September 26, 1988
Primary view of 100 Area D4 Project Building Completion Report: December 2008 to December 2009
K.G. Finucane, J.P. Harrie
October 26, 2010
Primary view of 100 Areas: April 16--April 22
Jordan, W. E.
April 26, 1946
Primary view of 100 Areas: (For Technical Progress Letter No. 107), July 16--22
Jordan, W. E.
July 26, 1946
Primary view of 125 TON MPC WASTE PACKAGE SHIELDING ANALYSIS/2-D DORT (SCPB: N/A)
Skulina, D. J.
February 26, 1996
Primary view of 200 area effluent treatment facility opertaional test report
Crane, A.F.
October 26, 1995
Primary view of 222-S LABORATORY FUME HOOD TESTING STUDY
Ruelas, B. H.
March 26, 2007
Primary view of 234-5 Building design philosophy
Work, J. B.
November 26, 1947
Back to Top of Screen