Search Results

open access

Design and Test of a Diaphragm Pump for Liquid Metals

Description: Technical report. From Abstract : "Details are provided on the construction and operation of a two-stage diaphragm pump successfully used for the first time in liquid metal service. From the results of 5,376 hr. test of the pump it was concluded that it is well suited to the pumping of liquid metals at low flow rates where pulsating flow can be tolerated and also where remote operation is required. Operating temperatures and pressures are limited only by the availability of suitable materials o… more
Date: April 12, 1963
Creator: Westerheide, D. E. & Clifford, J. C.
open access

The Design Study of Fluid Engine Power Systems

Description: From abstract: This report presents information generated during a six month feasibility study of an engine which uses a supercritical working fluid as the secondary portion of nuclear powered electric generating system.
Date: April 12, 1963
Creator: Baker, C. H.; Hunter, T. A.; Pauliukonis, R. S. & Pradhan, A. V.
open access

Irradiation Processing Department monthly report, March 1963

Description: This document details activities of the Irradiation Processing Department during the month of August, 1958. A general summary is included at the start of the report, after which the report is divided into the following sections: Research and Engineering Operations; Production and Reactor Operations; Facilities Engineering Operation; Employee Relations Operation; and Financial Operation.
Date: April 12, 1963
open access

Physics Pre-Startup Report: Esada Vallecitos Experimental Superheat Reactor

Description: This report defines the scope of the initial core loading and critical testing program and indicates acceptable methods for the execution of the tests. Included in the report is a compilation of results and conclusions from physics calculations performed to guide the testing and startup of the ESADA-Vallecitos Experimental Superheat Reactor (EVESR).
Date: April 12, 1963
Creator: Gietzen, A. J.; Tillinghast, T. & Weiss, M. L.
open access

Production test IP-582-D, Irradiation of depleted uranium in the KW Snout Facilities, HAPO-275

Description: The objective of this test is to produce 50 milligrams of neptunium 239 for a process stream study in the Purex plant. The efficient recovery of neptunium 237 as an alternate product produced at HAPO is presently impaired by the lack of knowledge of the distribution of neptunium 237 in the several Purex process streams. Present methods of following the neptunium 237 through the process streams involves inadequate alpha counting techniques. However, neptunium 239, because of its discrete gamma d… more
Date: April 12, 1963
Creator: Cox, J. H.
open access

Supplement A to PT-IP-572-A effect of eccentricity on the irradiation behavior of KVNS fuel elements

Description: With the use of smooth-bore Zircaloy-2 process tubes and self- supported fuel elements on a large scale at the K Reactors, establishment of the operating characteristics of this fuel element-process tube configuration is imperative. Under authority of Production Test-IP-409-A, two smooth-bore Zircaloy-2 tubes were routinely charged with KVNS fuel elements. Approximately 520 KVNS fuel elements have been irradiated in this facility. In Production Test-IP-572-A, the coolant temperature distributio… more
Date: April 12, 1963
Creator: Carlson, P. A. & Hladek, K. L.
Back to Top of Screen