DEVELOPMENT OF TECHNOLOGIES AND ANALYTICAL CAPABILITIES FOR VISION 21 ENERGY PLANTS

PDF Version Also Available for Download.

Description

The project management plan was finalized during a project kick off meeting held on January 16, 2001 in Lebanon, NH, which was attended by all project participants. The project management plan was submitted to DOE and was revised based on comments from DOE (Task 1.0). A survey of the potential users of the integrated software was conducted. A web-based survey form was developed and was announced in the ProcessCity discussion forum and in AspenTech's e-mail digest Aspen e-Flash. Several Fluent clients were individually contacted. A user requirements document was written (Task 2.2). As a prototype of AspenPlus-Fluent integration, the flowsheet … continued below

Physical Description

15 pages

Creation Information

Madhava Syamlal, Ph.D.` April 20, 2001.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 22 times. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The project management plan was finalized during a project kick off meeting held on January 16, 2001 in Lebanon, NH, which was attended by all project participants. The project management plan was submitted to DOE and was revised based on comments from DOE (Task 1.0). A survey of the potential users of the integrated software was conducted. A web-based survey form was developed and was announced in the ProcessCity discussion forum and in AspenTech's e-mail digest Aspen e-Flash. Several Fluent clients were individually contacted. A user requirements document was written (Task 2.2). As a prototype of AspenPlus-Fluent integration, the flowsheet for allyl alcohol production via the isomerization of propylene oxide was developed. A stirred tank reactor in the flowsheet for converting the byproduct acetone into n-propyl propionate was modeled with Fluent, version 5.4. The convergence of the AspenPlus-Fluent integrated model was demonstrated, and a list of data exchanges required between AspenPlus and Fluent was developed (Task 2.6). As the first demonstration case, the RP and L power plant was selected. A planning meeting was held on February 13, 2001 in Cambridge, MA to discuss this demonstration case. It was decided that the steam-side of the power plant would be modeled with AspenPlus and the gas-side, with the ALSTOM Power in-house code INDVU. A flowsheet model of the power plant was developed (Task 3.1). Three positive responses were received for the invitation to join the project Advisory Board. It was decided to expand the membership on the Advisory Board to include other industrial users interested in integrating AspenPlus and Fluent. Additional invitations were sent out (Task 5.0). Integraph's role in the project was restructured based on discussions among the project participants. Fluent hired Dr. Maxwell Osawe to work on the project. Dr. Osawe brings to the project a unique combination of skills (expertise in CFD and object-oriented design and programming) required for the software integration task (Task 7.0).

Physical Description

15 pages

Notes

OSTI as DE00783112

Source

  • Other Information: PBD: 20 Apr 2001

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • April 20, 2001

Added to The UNT Digital Library

  • Sept. 29, 2015, 5:31 a.m.

Description Last Updated

  • April 15, 2016, 12:57 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 22

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Madhava Syamlal, Ph.D.`. DEVELOPMENT OF TECHNOLOGIES AND ANALYTICAL CAPABILITIES FOR VISION 21 ENERGY PLANTS, report, April 20, 2001; Morgantown, West Virginia. (https://digital.library.unt.edu/ark:/67531/metadc717963/: accessed May 16, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen