Downsampled bunch-by-bunch feedback for PEP II

PDF Version Also Available for Download.

Description

The PEP II B Factory requires a feedback system to damp out longitudinal synchrotron oscillations. A time-domain bunch-by-bunch feedback system has been proposed in which each bunch is treated as an oscillator being driven by disturbances from the other bunches. The phase is detected, filtered, and the feedback correction signal is applied by the kicker. Since we are damping energy oscillations using measurements of phase, the required feedback signal must be proportional to the amplitude of the phase oscillations but phase shifted by 90 degrees. This signal must be calculated for each of the 1658 bunches, in parallel. In the … continued below

Physical Description

4 pages

Creation Information

Hindi, H. A.; Briggs, D.; Fox, J.; Hosseini, W. & Hutton, A. September 1, 1992.

Context

This article is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. More information about this article can be viewed below.

Who

People and organizations associated with either the creation of this article or its content.

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this article. Follow the links below to find similar items on the Digital Library.

Description

The PEP II B Factory requires a feedback system to damp out longitudinal synchrotron oscillations. A time-domain bunch-by-bunch feedback system has been proposed in which each bunch is treated as an oscillator being driven by disturbances from the other bunches. The phase is detected, filtered, and the feedback correction signal is applied by the kicker. Since we are damping energy oscillations using measurements of phase, the required feedback signal must be proportional to the amplitude of the phase oscillations but phase shifted by 90 degrees. This signal must be calculated for each of the 1658 bunches, in parallel. In the original proposal, it was estimated that a farm of approximately 480 digital signal processors (DIPS) would be required to implement the feedback system. However, using the technique of downsampling, this number can be reduced to about 50 DIPS. In what follows, we will briefly explain the basic idea of downsampling and its implementation.

Physical Description

4 pages

Notes

OSTI; NTIS; INIS; GPO Dep.

Source

  • B factories: state of the art in accelerators, detectors, and physics, Stanford, CA (United States), 6-10 Apr 1992

Language

Item Type

Identifier

Unique identifying numbers for this article in the Digital Library or other systems.

  • Other: DE93004090
  • Report No.: SLAC-PUB-5919
  • Report No.: CONF-9204126--17
  • Grant Number: AC03-76SF00515
  • Office of Scientific & Technical Information Report Number: 7178890
  • Archival Resource Key: ark:/67531/metadc1449769

Collections

This article is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this article?

When

Dates and time periods associated with this article.

Creation Date

  • September 1, 1992

Added to The UNT Digital Library

  • Feb. 10, 2019, 8:45 p.m.

Description Last Updated

  • May 29, 2019, 1:12 p.m.

Usage Statistics

When was this article last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 4

Interact With This Article

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Hindi, H. A.; Briggs, D.; Fox, J.; Hosseini, W. & Hutton, A. Downsampled bunch-by-bunch feedback for PEP II, article, September 1, 1992; Menlo Park, California. (https://digital.library.unt.edu/ark:/67531/metadc1449769/: accessed May 24, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen