The PEP II B Factory requires a feedback system to damp out longitudinal synchrotron oscillations. A time-domain bunch-by-bunch feedback system has been proposed in which each bunch is treated as an oscillator being driven by disturbances from the other bunches. The phase is detected, filtered, and the feedback correction signal is applied by the kicker. Since we are damping energy oscillations using measurements of phase, the required feedback signal must be proportional to the amplitude of the phase oscillations but phase shifted by 90 degrees. This signal must be calculated for each of the 1658 bunches, in parallel. In the …
continued below
Publisher Info:
Stanford Linear Accelerator Center, Menlo Park, CA (United States)
Place of Publication:
Menlo Park, California
Provided By
UNT Libraries Government Documents Department
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Descriptive information to help identify this article.
Follow the links below to find similar items on the Digital Library.
Description
The PEP II B Factory requires a feedback system to damp out longitudinal synchrotron oscillations. A time-domain bunch-by-bunch feedback system has been proposed in which each bunch is treated as an oscillator being driven by disturbances from the other bunches. The phase is detected, filtered, and the feedback correction signal is applied by the kicker. Since we are damping energy oscillations using measurements of phase, the required feedback signal must be proportional to the amplitude of the phase oscillations but phase shifted by 90 degrees. This signal must be calculated for each of the 1658 bunches, in parallel. In the original proposal, it was estimated that a farm of approximately 480 digital signal processors (DIPS) would be required to implement the feedback system. However, using the technique of downsampling, this number can be reduced to about 50 DIPS. In what follows, we will briefly explain the basic idea of downsampling and its implementation.
This article is part of the following collection of related materials.
Office of Scientific & Technical Information Technical Reports
Reports, articles and other documents harvested from the Office of Scientific and Technical Information.
Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.
Hindi, H. A.; Briggs, D.; Fox, J.; Hosseini, W. & Hutton, A.Downsampled bunch-by-bunch feedback for PEP II,
article,
September 1, 1992;
Menlo Park, California.
(https://digital.library.unt.edu/ark:/67531/metadc1449769/:
accessed May 24, 2024),
University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu;
crediting UNT Libraries Government Documents Department.