Among all equipment types considered for seismic qualification, relays have been most extensively studied through testing due to a wide variation of their designs and seismic capacities. A temporary electrical discontinuity or ``chatter`` is the common concern for relays. A chatter duration of 2 milliseconds is typically used as an acceptance criterion to determine the seismic capability of a relay. Many electrical devices, on the other hand, receiving input signals from relays can safely tolerate a chatter level much greater than 2 ms. In Phase I of a test program, Brookhaven National Laboratory performed testing of many relay models using …
continued below
Publisher Info:
Brookhaven National Lab., Upton, NY (United States)
Place of Publication:
Upton, New York
Provided By
UNT Libraries Government Documents Department
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Descriptive information to help identify this article.
Follow the links below to find similar items on the Digital Library.
Description
Among all equipment types considered for seismic qualification, relays have been most extensively studied through testing due to a wide variation of their designs and seismic capacities. A temporary electrical discontinuity or ``chatter`` is the common concern for relays. A chatter duration of 2 milliseconds is typically used as an acceptance criterion to determine the seismic capability of a relay. Many electrical devices, on the other hand, receiving input signals from relays can safely tolerate a chatter level much greater than 2 ms. In Phase I of a test program, Brookhaven National Laboratory performed testing of many relay models using the 2-ms chatter criterion. In Phase II of the program, the factors influencing the relay chatter criterion, and impacts of relay chatter on medium and low voltage circuit breakers and lockout relays were investigated. This paper briefly describes the Phase II tests and presents the important observations.
Physical Description
11 p.
Notes
INIS; OSTI as DE94009075; Paper copy available at OSTI: phone, 865-576-8401, or email, reports@adonis.osti.gov
This article is part of the following collection of related materials.
Office of Scientific & Technical Information Technical Reports
Reports, articles and other documents harvested from the Office of Scientific and Technical Information.
Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.