Feasibility assessment: Lake Frances power generation facilities for the city of Siloam Springs, Arkansas

PDF Version Also Available for Download.

Description

The feasibility of developing the power potential of the Illinois River at the Lake Frances Dam for utilization by the city of Siloam Springs, Arkansas, was studied. It was found that the average annual power production potential of this site is 3.8 MWh; the cost saving produced by the proposed hydropower project will not support any remedial rehabilitation costs of the entire dam structure; development and operation of this hydropower project would save nonrenewal types of energy; if the capital cost can be fixed at present day prices, the development will become economically feasible when electric costs increase by 43%; … continued below

Physical Description

103 pages

Creation Information

Creator: Unknown. April 1, 1979.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 30 times. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Creator

  • We've been unable to identify the creator(s) of this report.

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The feasibility of developing the power potential of the Illinois River at the Lake Frances Dam for utilization by the city of Siloam Springs, Arkansas, was studied. It was found that the average annual power production potential of this site is 3.8 MWh; the cost saving produced by the proposed hydropower project will not support any remedial rehabilitation costs of the entire dam structure; development and operation of this hydropower project would save nonrenewal types of energy; if the capital cost can be fixed at present day prices, the development will become economically feasible when electric costs increase by 43%; and there will be no significant adverse environmental impact resulting from either the construction or operation of the hydropower facilities. It was concluded that the hydropower facilities should be constructed, owned and operated by the city of Siloam Springs, provided the dam safety can be assured and sources of funding can be made available so that the annual costs will not exceed the annual savings. (LCL)

Physical Description

103 pages

Notes

Dep. NTIS, PC A06/MF A01.

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • April 1, 1979

Added to The UNT Digital Library

  • Feb. 18, 2018, 3:59 p.m.

Description Last Updated

  • March 16, 2021, 7:16 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 30

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Feasibility assessment: Lake Frances power generation facilities for the city of Siloam Springs, Arkansas, report, April 1, 1979; United States. (https://digital.library.unt.edu/ark:/67531/metadc1095464/: accessed May 25, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen