HRP Dynamic Slurry Corrosion Studies : Quarter Ending April 30, 1957
Description:
The assembly of a second thorium oxide slurry corrosion test facility, loop BS, has been completed and 2010 hr of operation on slurry have been logged. This second test loop has proved satisfactory from an .operational standpoint. Corrosion data and operational observations are given for six thorium oxide slurry runs made at 300 C in 100A pump loops BS and CS. A new development model of the rotator for an in-pile slurry toroid is described.
Date:
April 30, 1957
Creator:
Compere, E. L. (Edgar L.); Savage, H. C.; Reed, S. A.; Warner, R. M.; Ulrich, W. C.; Cole, H. D. et al.
Partner:
UNT Libraries Government Documents Department