Second and Third Operating Test of HRT Core Vessel Transition Joint and Expansion Bellows Mockup

One of 529 reports in the series: CF (Series) available on this site.

PDF Version Also Available for Download.

Description

Second and third tests were conducted on an expansion bellows and Zircaloy-stainless steel transition joint assembly, duplicating that used in the core-pressure vessel assembly of the HRT. The assembly was exposed for 1140 hours in the second test and and 167 hours in the third to a solution containing 0.04m UO2SO4, 0.02m H2SO4, and 0.005m CuSO4 in a 100A dynamic corrosion loop under conditions simulating reactor startup, shutdown, and steady-state operation. Results indicated that the transition joint assembly as tested was mechanically sound and leak-tight. Pit-type corrosion continued on the expansion bellows where the upper retaining tangent contacts the bellows. … continued below

Physical Description

39 pages : illustrations

Creation Information

Greeley, R. S.; Ulrich, W. C.; Savage, H. C.; Griess, J. C. & Mauney, T. H. April 30, 1957.

Context

This report is part of the collection entitled: TRAIL Microcard Collection and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Publisher

Audiences

We've identified this report as a primary source within our collections. Researchers, educators, and students may find this report useful in their work.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Titles

  • Main Title: Second and Third Operating Test of HRT Core Vessel Transition Joint and Expansion Bellows Mockup
  • Series Title: CF (Series)
  • Series Title: Oak Ridge National Laboratory Reports
  • Added Title: Oak Ridge National Laboratory Report CF-57-4-44

Description

Second and third tests were conducted on an expansion bellows and Zircaloy-stainless steel transition joint assembly, duplicating that used in the core-pressure vessel assembly of the HRT. The assembly was exposed for 1140 hours in the second test and and 167 hours in the third to a solution containing 0.04m UO2SO4, 0.02m H2SO4, and 0.005m CuSO4 in a 100A dynamic corrosion loop under conditions simulating reactor startup, shutdown, and steady-state operation. Results indicated that the transition joint assembly as tested was mechanically sound and leak-tight. Pit-type corrosion continued on the expansion bellows where the upper retaining tangent contacts the bellows. Results are included of specimens exposed to the circulation solution during transition joint and bellows test.

Physical Description

39 pages : illustrations

Notes

Digitized from microopaque cards (2).

Subjects

Library of Congress Genre/Form Terms

Library of Congress Subject Headings

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: CF-57-4-44
  • Grant Number: W-7405-eng-26
  • SuDoc Number: Y 3.At 7:22/CF-57-4-44
  • Accession or Local Control No: metadc1202891
  • Archival Resource Key: ark:/67531/metadc1202891

Collections

This report is part of the following collections of related materials.

TRAIL Microcard Collection

Imaged from microcard, these technical reports describe research performed for U.S. government agencies from the 1930s to the 1960s. The reports were provided by the Technical Report Archive and Image Library (TRAIL).

Technical Report Archive and Image Library

The Technical Report Archive & Image Library (TRAIL) identifies, acquires, catalogs, digitizes and provides unrestricted access to U.S. government agency technical reports. The mission of TRAIL is to ensure preservation, discoverability, and persistent open access to government technical publications regardless of form or format.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • April 30, 1957

Added to The UNT Digital Library

  • July 9, 2023, 5:30 p.m.

Description Last Updated

  • April 18, 2024, 12:53 p.m.

Usage Statistics

When was this report last used?

Congratulations! It looks like you are the first person to view this item online.

Where

Geographical information about where this report originated or about its content.

Place Name

Publication Place

Map Information

  • map marker Place Name coordinates. (May be approximate.)
  • Repositioning map may be required for optimal printing.

Mapped Locations

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Greeley, R. S.; Ulrich, W. C.; Savage, H. C.; Griess, J. C. & Mauney, T. H. Second and Third Operating Test of HRT Core Vessel Transition Joint and Expansion Bellows Mockup, report, April 30, 1957; Oak Ridge, Tennessee. (https://digital.library.unt.edu/ark:/67531/metadc1202891/: accessed July 16, 2025), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen