Search Results

open access

SM-1 Research and Development Program, Activity Buildup Program Task 1 : final report February 1958 to June 1959

Description: Abstract: The results of activity buildup studies in the SM-1 (APPR-1) performed from February 1958 to January 1959 are reported. Data are presented on the extent, nature, and mechanism of the buildup of long-lived gamma emitting nuclides in the reactor primary system. Mathematical equations to describe the activity buildup are derived. Radiation levels after reactor shutdown are presented, as well as the predicted radiation levels at the end of core life.
Date: August 10, 1959
Creator: Brown, William S.; Bergen, C. Richard.; Bergmann, Carl A.; Chupak, Julius.; Fitzsimmons, Susanne R. & Grant, Louis G.
Partner: UNT Libraries Government Documents Department
open access

SM-2 Critical Experiments : CE-1

Description: Abstract: Critical experiment studies were performed, varying the parameters U235, B10 and metal to water ratio, in the SM-2 7 x 7 core configuration with 38 stationary elements and seven control rods of the SM-1 (APPR-1) type. An experimental mock-up of the SM-1 was assembled using the basic SM-2 fuel plates. Excellent agreement between the SM-1 boron loading, determined by chemical analysis, and the SM-1 mock-up boron loading, for equivalent bank positions, was noted. Several SM-2 mock-ups, … more
Date: November 30, 1959
Creator: Noaks, J. W.; McCool, W. J.; Robinson, R. A.; Schrader, E. W. & Weiss, S. H.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen