WASTE CERTIFICATION PROGRAM PLAN - REVISION 7 Page: 30 of 72
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
5.2 Environmental Protection and Waste Services - Waste Services Group
The Waste Services group of Environmental Protection and Waste Services (EPWS)
consists of both those functions relating to generator support (i.e. generator interface and waste
acceptance) and functions associated with executing the final certification of UT-Battelle-
generated wastes. The specific responsibilities of those functional elements are as follows:
5.2.1 Generator Support
The generator support responsibilities of EPWS include:
" Preparation and implementation of the WCP Training Program based on the training
requirements established by the lead WCO;
" Reviewing WACs and IPs;
" Transferring and approving transfers of hazardous/mixed waste from generators satellite
accumulation area/90-day areas (SAA/90DA) to consolidated 90DA;
" Verifying that waste is in compliance with WAC requirements (i.e., executing Control
Points 1-2;
" Transferring waste to the receiving organization (when applicable);
" Controlling records per WCP implementing procedures;
" Resolving Control Point / Certification Process Step errors with generators/GI/GIE/lead
WCO drawing on resources such as Environmental Protection (EP) and Office of
Radiation Protection (ORP) as needed.
" Conducting internal self-assessments;
" Verifying generators and GIs/GIEs, Waste Acceptance Coordinators, and waste-handling
group and lead WCO are properly trained per the Training Program Administrative
Guide, LWS 101.20;
" Overseeing the Generator Interface Group function;
" Appointing GI, Waste Acceptance Coordinator, and waste-handling personnel
" Providing GI, Waste Acceptance Coordinator, and waste-handling services as requested;
and
" Preparation of waste packaging materials specifications for procurement of packaging
materials from commercial suppliers.
The primary responsibility of GI/GIE is to assist the waste generators in meeting their
responsibilities (Section. 5.1) and to indicate by their signature the generator waste
characterization and packaging meet the applicable WAC. This includes notifying generators of
changes to WAC requirements. In addition, GI/GIE personnel may be asked to provide the
following services:
" Assisting in waste characterization;
" Completing waste disposal forms;
" Coordinating waste removal;
" Forecasting waste generation;-21
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Matching Search Results
View four places within this report that match your search.Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
MORGAN, LK. WASTE CERTIFICATION PROGRAM PLAN - REVISION 7, report, January 8, 2002; United States. (https://digital.library.unt.edu/ark:/67531/metadc733998/m1/30/?q=technical+manual: accessed July 17, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.