Demonstration of oxygen-enriched air staging at Owens-Brockway glass containers. Quarterly report. Feb. 1, 1996--Apr. 30, 1996 Page: 1 of 6
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
DOE F 4600.6
(09-92)
Replaces EIA-459F
All Other Editions Are ObsoleteU.S. DEPARTMENT OF ENERGY
FEDERAL ASSISTANCE PROGRAMIPROJECT STATUS REPORTOMB Control No.
1910-0400OMB Burden Disclosure Statement
Public reporting burden for this collection of information is estimated to average 47.5 hours per response, including the time for reviewing instructions,
searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send
comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Office
of Information Resources Management, AD-241_2 - GTN, Paperwork Reduction Project (1910-0400), U.S. Department of Energy, 1000 Independence
Avenue, S.W., Washington, DC 20585; and to the Office of Management and Budget (OMB), Paperwork Reduction Project (1910-0400), Washington,
DC 20503.
1. Program/Project Identification No. 2. Program/Project Title: Demonstration of 3. Reporting Period
DE-FC07-95ID13378 Oxygen-Enriched Air Staging at Owens-
Brockway Glass Containers Feb. 1, 1996 through Apr. 30, 1996
4. Name and Address 5. Program/Project Start Date
Institute of Gas Technology Aug. 1, 1995
1700 S. Mt. Prospect Rd.
Des Plaines, IL 60018-1804 6. Completion Date
Dec. 31, 1996
7. Approach Changes
None
8. Performance Variances, Accomplishments, or Problems
See attached quarterly report.
None
9. Open Items
None
10. Status Assessment and Forecast
Fabrication of OEAS components including the air and oxygen skids and the instrumentaion system was completed in February. Baseline and
single port pair testing were conducted in March and late April. Full fumace retrofit will be completed in the spring and early summer. Full furnace
testing with OEAS will be performed in August. This project is on schedule.
No Deviation from Plan is Expected
11. Description of Attachments
Quarterly report for the period Nov. 1, 1995 - Jan. 31, 1996
None
12. Signature of Recipient and Date 13. Signature of U.S. Department of Energy (DOE) Reviewing Representative and
DateDR:(c:\32029\reports\32029may.doc)
MASTER
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Demonstration of oxygen-enriched air staging at Owens-Brockway glass containers. Quarterly report. Feb. 1, 1996--Apr. 30, 1996, report, July 1, 1996; United States. (https://digital.library.unt.edu/ark:/67531/metadc672451/m1/1/: accessed May 5, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.