Action Description Memorandum for the FY 1989 Line Item: Environmental, Safety and Health Upgrades, Phase 2 Page: 4 of 7
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
ES&H UPGRADES, PHASE II
1.0 CONCISE DESCRIPTION OF THE PROPOSED ACTION
This ADM documents the evaluation of the potential environmental impact
hazards from the Environmental, Safety and Health Upgrades, Phase II,
project.
1.1 DESCRIPTION AND SCOPE OF PROJECT
Environmental, Safety and Health Upgrades, Phase II, project is a
$6,500,000 Line Item project for FY 1989. The project is identified in
the FY 1989 Budget Submission documents as Project No. 89-DA-01.
ES&H Phase II, is a portion of a continuing effort to protect the
environment, our neighbors and our employees from any adverse effects
caused by the development and production missions of EG&G Mound Applied
Technologies.
The three parts of ES&H Phase II include:
A) New piping to separate potable water from domestic and process_ water.
B) Improvements in explosive storage facilities.
C) Upgrades-of the fuel oil storage systems, including a new tank; the
containment basin, and dike.
1.2 SPECIFIC COMPONENTS OF THE PROJECT
Specific components of Part A of the project are as follows:
a). New water distribution systems will be installed in each building.
b) Within each building the process water system will be separated fro
from the potable water system by an OSHA approved back flow
preventer.
c) New connections will be made to existing drinking fountains,
lavatories, eyewashes and showers.
Specific components of Part B of the project are as follows:
a) Six new magazine bays will be provided.
b) Provide new barricades at three buildings and at three magazines.
c) Lightning protection.
d) Loading and unloading facilities for transported explosives materials.Page 1 of 4
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Adams, Frank S.; Hunter, Michael R. & Anderson, Carol R. Action Description Memorandum for the FY 1989 Line Item: Environmental, Safety and Health Upgrades, Phase 2, report, March 1, 1989; Miamisburg, Ohio. (https://digital.library.unt.edu/ark:/67531/metadc625007/m1/4/: accessed April 26, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.