Homogeneous Reactor Project Quarterly Progress Report for Period Ending July 31, 1955

One of 3 reports in the title: ORNL Homogeneous Reactor Project Progress Report available on this site.

PDF Version Also Available for Download.

Description

Construction of the HRT reactor shield tank was completed, and the inside surfaces were painted. The roof structure for the tank is being assembled in preparation for an acceptance pressure test. Service piping and instrument lines are being installed in the central room area by ORNL craft forces. This work is approximately 50% complete. Fabrication of all temperature system components, except the blanket outer storage tanks, has been completed.

Creation Information

McDuffie, H. F. & Kelly, D. C. October 10, 1955.

Context

This report is part of the collection entitled: TRAIL Microcard Collection and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 13 times. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Research team members

Originator

Research team heads

Research team members

Sponsor

Publisher

Audiences

We've identified this report as a primary source within our collections. Researchers, educators, and students may find this report useful in their work.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Titles

Description

Construction of the HRT reactor shield tank was completed, and the inside surfaces were painted. The roof structure for the tank is being assembled in preparation for an acceptance pressure test. Service piping and instrument lines are being installed in the central room area by ORNL craft forces. This work is approximately 50% complete. Fabrication of all temperature system components, except the blanket outer storage tanks, has been completed.

Notes

Digitized from microopaque cards (8).

"Date Received by Information and Reports Division (August 9, 1955)."

"Date Issued Oct 10 1955."

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

Collections

This report is part of the following collections of related materials.

TRAIL Microcard Collection

Imaged from microcard, these technical reports describe research performed for U.S. government agencies from the 1930s to the 1960s. The reports were provided by the Technical Report Archive and Image Library (TRAIL).

Technical Report Archive and Image Library

The Technical Report Archive & Image Library (TRAIL) identifies, acquires, catalogs, digitizes and provides unrestricted access to U.S. government agency technical reports. The mission of TRAIL is to ensure preservation, discoverability, and persistent open access to government technical publications regardless of form or format.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • October 10, 1955

Coverage Date

Added to The UNT Digital Library

  • Feb. 6, 2022, 9:33 a.m.

Description Last Updated

  • May 27, 2022, 3:39 a.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 13

Where

Geographical information about where this report originated or about its content.

Place Name

Publication Place

Map Information

  • map marker Place Name coordinates. (May be approximate.)
  • Repositioning map may be required for optimal printing.

Mapped Locations

Interact With This Report

Here are some suggestions for what to do next.

Top Search Results

We found eight places within this report that matched your search. View Now

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

McDuffie, H. F. & Kelly, D. C. Homogeneous Reactor Project Quarterly Progress Report for Period Ending July 31, 1955, report, October 10, 1955; Washington D.C.. (https://digital.library.unt.edu/ark:/67531/metadc1957001/: accessed June 8, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen