It is the objective of this study to investigate preliminary expansion program requirements for process water, as supplied by 190 Building equipment; from the point of view of practical pumping, flywheel and pump suction head requirements. These requirements are to be determined at this time in such a form and accuracy as to be useful in refined estimating for budget study purposes. In order to obtain the objectives of this study at this time it has been decided to consider five different conditions of process water flow to a reactor. These conditions are flow to the reactor under summer conditions …
continued below
Publisher Info:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Place of Publication:
Richland, Washington
Provided By
UNT Libraries Government Documents Department
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Descriptive information to help identify this report.
Follow the links below to find similar items on the Digital Library.
Description
It is the objective of this study to investigate preliminary expansion program requirements for process water, as supplied by 190 Building equipment; from the point of view of practical pumping, flywheel and pump suction head requirements. These requirements are to be determined at this time in such a form and accuracy as to be useful in refined estimating for budget study purposes. In order to obtain the objectives of this study at this time it has been decided to consider five different conditions of process water flow to a reactor. These conditions are flow to the reactor under summer conditions of operation in gallons per minute with a corresponding top of riser pressure in pounds per square inch: 85,000 gal/min, 580 psi; 100,000 gal/min, 480 psi; 130,000 gal/min, 280 psi; 150,000 gal/min, 280 psi; and 150,000 gal/min, 150 psi.
Physical Description
5 p.
Notes
OSTI as DE94016263; Paper copy available at OSTI: phone, 865-576-8401, or email, reports@adonis.osti.gov
This report is part of the following collection of related materials.
Office of Scientific & Technical Information Technical Reports
Reports, articles and other documents harvested from the Office of Scientific and Technical Information.
Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.