A task force recommended that the technical feasibility of a ``Late Wash` facility be assessed [1]. In this facility, each batch of tetraphenylborate slurry from Tank 49 would be given a final wash to reduce the concentrations of nitrite and radiolysis products to acceptable levels. Laboratory-scale studies have demonstrated that d the nitrite content of the slurry fed to DWPF is reduced to 0.01 M or less (and at least a 4X reduction in concentration of the soluble species is attained), (1) the need for HAN during hydrolysis is eliminated (eliminating the production of ammonium ion during hydrolysis), (2) hydrolysis …
continued below
Publisher Info:
Westinghouse Savannah River Co., Aiken, SC (United States)
Place of Publication:
Aiken, South Carolina
Provided By
UNT Libraries Government Documents Department
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Descriptive information to help identify this report.
Follow the links below to find similar items on the Digital Library.
Description
A task force recommended that the technical feasibility of a ``Late Wash` facility be assessed [1]. In this facility, each batch of tetraphenylborate slurry from Tank 49 would be given a final wash to reduce the concentrations of nitrite and radiolysis products to acceptable levels. Laboratory-scale studies have demonstrated that d the nitrite content of the slurry fed to DWPF is reduced to 0.01 M or less (and at least a 4X reduction in concentration of the soluble species is attained), (1) the need for HAN during hydrolysis is eliminated (eliminating the production of ammonium ion during hydrolysis), (2) hydrolysis may be done with a catalyst concentration that will not exceed the copper solubility in glass and (3) the non-polar organic production during hydrolysis is significantly reduced. The first phase of an aggressive research and development program has been completed and all test results obtained to date support the technical feasibility of Late Washing. Paralleling this research and development effort is an aggressive design study directed by DWPF to scope and cost retrofitting the Auxiliary Pump Pit (APP) to enable performing a final wash of each batch of precipitate slurry before R is transferred into the DWPF Soft Processing Cell (SPC). An initial technical bases for the Late Wash Facility was transmitted to DWPF on June 15, 1992. Research and development activities are continuing directed principally at optimization of the cross-f low fitter decontamination methodology and pilot-scale validation of the recommended benzene stripping metodology.
This report is part of the following collection of related materials.
Office of Scientific & Technical Information Technical Reports
Reports, articles and other documents harvested from the Office of Scientific and Technical Information.
Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.
Fish, D. L. & Landon, L. F.Technical bases DWPF Late Washing Facility. Revision 1,
report,
August 10, 1992;
Aiken, South Carolina.
(https://digital.library.unt.edu/ark:/67531/metadc1275454/:
accessed July 16, 2024),
University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu;
crediting UNT Libraries Government Documents Department.