Quality-Assurance Approach for the Elmo Bumpy Torus Proof-of-Principal Experiment

PDF Version Also Available for Download.

Description

Components, subsystems and systems will be subjected to inspection and test as necessary to ensure compliance to applicable specifications, Acceptance Test Procedures and/or customer requirements. Quality Assurance will inspect each component, subsystem and system for selected mechanical and electrical defects. In addition, Quality Assurance will either perform, or verify performance of, and analyze, or verify analysis of, all required field and laboratory tests. If hardware is modified, repaired or replaced after final testing, necessary re-inspection and retest must be performed. Insofar as possible the component, subsystem or system will be released as acceptable upon completion of these activities. When nonconformances … continued below

Physical Description

16 pages

Creation Information

Sticksel, F. M. January 1, 1981.

Context

This article is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 68 times. More information about this article can be viewed below.

Who

People and organizations associated with either the creation of this article or its content.

Publishers

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this article. Follow the links below to find similar items on the Digital Library.

Description

Components, subsystems and systems will be subjected to inspection and test as necessary to ensure compliance to applicable specifications, Acceptance Test Procedures and/or customer requirements. Quality Assurance will inspect each component, subsystem and system for selected mechanical and electrical defects. In addition, Quality Assurance will either perform, or verify performance of, and analyze, or verify analysis of, all required field and laboratory tests. If hardware is modified, repaired or replaced after final testing, necessary re-inspection and retest must be performed. Insofar as possible the component, subsystem or system will be released as acceptable upon completion of these activities. When nonconformances are detected during the course of site surveillance activities, MDAC or Gilbert/Commonwealth will initiate a Nonconformance Record for review by MDAC Quality Assurance and Project Engineering personnel. These nonconformances will be identified and dispositioned per MDAC Standard Practices with the advice and concurrence of Gilbert/Commonwealth personnel, if deemed appropriate. MDAC Quality Assurance personnel will witness the pre-operational testing and review the test data.

Physical Description

16 pages

Notes

NTIS, PC A02/MF A01.

Source

  • IEA Tokamak quality assurance workshop, Princeton, NJ, USA, 2 Jun 1981

Language

Item Type

Identifier

Unique identifying numbers for this article in the Digital Library or other systems.

  • Other: DE81023224
  • Report No.: CONF-810654-2
  • Grant Number: W-7405-ENG-26
  • Office of Scientific & Technical Information Report Number: 6423183
  • Archival Resource Key: ark:/67531/metadc1209019

Collections

This article is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this article?

When

Dates and time periods associated with this article.

Creation Date

  • January 1, 1981

Added to The UNT Digital Library

  • July 5, 2018, 11:11 p.m.

Description Last Updated

  • Jan. 14, 2021, 12:06 p.m.

Usage Statistics

When was this article last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 68

Interact With This Article

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Sticksel, F. M. Quality-Assurance Approach for the Elmo Bumpy Torus Proof-of-Principal Experiment, article, January 1, 1981; United States. (https://digital.library.unt.edu/ark:/67531/metadc1209019/: accessed July 16, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen