We've identified this
report
as a primary source within our collections. Researchers, educators, and students may find this report useful in their work.
Provided By
UNT Libraries Government Documents Department
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Multiloop Integral System Test (MIST): Appendix A. [Key Plots for Test 8, Pumps Operating], ark:/67531/metadc2135276/
Multiloop Integral System Test (MIST): Appendix A. [Key Plots for Test 0, Increased Leak Size], ark:/67531/metadc2135269/
Multiloop Integral System Test (MIST): Appendix A. [Key Plots for Test 9, Cold Leg Discharge Leak], ark:/67531/metadc2135277/
Multiloop Integral System Test (MIST): Appendix A. [Key Plots for Test 7, Lowered SC Levels], ark:/67531/metadc2135275/
Multiloop Integral System Test (MIST): Appendix A. [Key Plots for Test 1, Isolated Pressurizer], ark:/67531/metadc2135270/
Multiloop Integral System Test (MIST): Appendix A. [Key Plots for Test 3, Nominal - 5 cm2], ark:/67531/metadc2135271/
Multiloop Integral System Test (MIST): Appendix A. [Key Plots for Test 4, No HP1-Leak Cooling], ark:/67531/metadc2135272/
Multiloop Integral System Test (MIST): Appendix A. [Key Plots for Test 5, RVVVs Closed], ark:/67531/metadc2135273/
Multiloop Integral System Test (MIST): Appendix A. [Key Plots for Test 6, Unequal SG Levels], ark:/67531/metadc2135274/
Collections
This report is part of the following collection of related materials.
Technical Report Archive and Image Library
The Technical Report Archive & Image Library (TRAIL) identifies, acquires, catalogs, digitizes and provides unrestricted access to U.S. government agency technical reports. The mission of TRAIL is to ensure preservation, discoverability, and persistent open access to government technical publications regardless of form or format.
Dataset presenting a graphical representation of final testing data for multiloop integral system test (MIST) group 30 mapping test 8 (T300806): pumps operating.
Relationship to this item: (References)
Multiloop Integral System Test (MIST): Appendix A. [Key Plots for Test 8, Pumps Operating], ark:/67531/metadc2135276/
Dataset presenting a graphical representation of final testing data for multiloop integral system test (MIST) group 30 mapping test 0 (T300001): increase leak size.
Relationship to this item: (References)
Multiloop Integral System Test (MIST): Appendix A. [Key Plots for Test 0, Increased Leak Size], ark:/67531/metadc2135269/
Dataset presenting a graphical representation of final testing data for multiloop integral system test (MIST) group 30 mapping test 9 (T3009AA): cold leg discharge leak.
Relationship to this item: (References)
Multiloop Integral System Test (MIST): Appendix A. [Key Plots for Test 9, Cold Leg Discharge Leak], ark:/67531/metadc2135277/
Dataset presenting a graphical representation of final testing data for multiloop integral system test (MIST) group 30 mapping test 7 (T3007CC): lowered SG levels.
Relationship to this item: (References)
Multiloop Integral System Test (MIST): Appendix A. [Key Plots for Test 7, Lowered SC Levels], ark:/67531/metadc2135275/
Dataset presenting a graphical representation of final testing data for multiloop integral system test (MIST) group 30 mapping test 1 (T3001BB): isolated pressurizer.
Relationship to this item: (References)
Multiloop Integral System Test (MIST): Appendix A. [Key Plots for Test 1, Isolated Pressurizer], ark:/67531/metadc2135270/
Dataset presenting a graphical representation of final testing data for multiloop integral system test (MIST) group 30 mapping test 3 (T3003AA): nominal - 5 cm2.
Relationship to this item: (References)
Multiloop Integral System Test (MIST): Appendix A. [Key Plots for Test 3, Nominal - 5 cm2], ark:/67531/metadc2135271/
Dataset presenting a graphical representation of final testing data for multiloop integral system test (MIST) group 30 mapping test 4 (T3004CC): No HPI-Leak Cooling.
Relationship to this item: (References)
Multiloop Integral System Test (MIST): Appendix A. [Key Plots for Test 4, No HP1-Leak Cooling], ark:/67531/metadc2135272/
Dataset presenting a graphical representation of final testing data for multiloop integral system test (MIST) group 30 mapping test 5 (T300504): RVVVs closed.
Relationship to this item: (References)
Multiloop Integral System Test (MIST): Appendix A. [Key Plots for Test 5, RVVVs Closed], ark:/67531/metadc2135273/
Dataset presenting a graphical representation of final testing data for multiloop integral system test (MIST) group 30 mapping test 6, (T300605): Unequal SG Levels
Relationship to this item: (References)
Multiloop Integral System Test (MIST): Appendix A. [Key Plots for Test 6, Unequal SG Levels], ark:/67531/metadc2135274/