Search Results

open access

20-kW Solar Photovoltaic Flat-Panel Power System for an Uninterruptible Power-System Load in El Paso, Texas. Phase Ii. System Fabrication. Final Report October 1, 1979-May 31, 1981

Description: The system plans, construction, integration and test, and performance evaluation are discussed for the photovoltaic power supply at the Newman Power Station in El Paso, Texas. The system consists of 64 parallel-connected panels, each panel containing nine series-connected photovoltaic modules. The system is connected, through power monitoring equipment, to an existing DC bus that supplies uninterruptible power to a computer that controls the power generating equipment. The site is described and… more
Date: December 1, 1981
Creator: Risser, V.V.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen