Final report on Production Test No. 105-1-MR -- Poison column control during reactor operation

Description: The lack of control rod capacity in the reactors with nine rods is causing significant production losses. The present control system, which functioned satisfactorily at a 300 MW equilibrium power level, is unable to counteract the larger startup reactivity transient effects at the current high power levels. This lack of strength causes the power level to be restricted during startup. The control system is also not flexible enough to prevent outages for the discharge of temporary poison. (1) A m… more
Date: July 24, 1952
Creator: Schilling, R. D. & Hess, K. W.
Partner: UNT Libraries Government Documents Department
open access

Slug jacket failures, January 1952

Description: There were twenty slug jacket failures during the month of January 1952. Of these, fourteen were end cap failures, five were split slugs and one has not been removed. A total of 311.4 hours of outage time was required for removal of these ruptured slugs from the reactors. The detection, removal and radiation aspects, along with the slug data, are shown on the attached sheets.
Date: February 13, 1952
Creator: Lewis, C. G.
Partner: UNT Libraries Government Documents Department