Search Results

open access

1?10 kW Stationary Combined Heat and Power Systems Status and Technical Potential: Independent Review

Description: This independent review examines the status and technical potential of 1-10 kW stationary combined heat and power fuel cell systems and analyzes the achievability of the DOE cost, efficiency, and durability targets for 2012, 2015, and 2020.
Date: November 1, 2010
Creator: Maru, H. C.; Singhal, S. C.; Stone, C. & Wheeler, D.
Partner: UNT Libraries Government Documents Department
open access

1.5D Quasilinear Model for Alpha Particle-TAE Interaction in ARIES ACT-I

Description: We study the TAE interaction with alpha particle fusion products in ARIES ACT-I using the 1.5D quasilinear model. 1.5D uses linear analytic expressions for growth and damping rates of TAE modes evaluated using TRANSP pro les to calculates the relaxation of pressure pro les. NOVA- K simulations are conducted to validate the analytic dependancies of the rates, and to normalize their absolute value. The low dimensionality of the model permits calculating loss diagrams in large parameter spaces.
Date: January 30, 2013
Creator: Ghantous, K.; Gorelenkov, N. N.; Kessel, C. & Poli, F.
Partner: UNT Libraries Government Documents Department
open access

1 mil gold bond wire study.

Description: In microcircuit fabrication, the diameter and length of a bond wire have been shown to both affect the current versus fusing time ratio of a bond wire as well as the gap length of the fused wire. This study investigated the impact of current level on the time-to-open and gap length of 1 mil by 60 mil gold bond wires. During the experiments, constant current was provided for a control set of bond wires for 250ms, 410ms and until the wire fused; non-destructively pull-tested wires for 250ms; and … more
Date: May 1, 2013
Creator: Huff, Johnathon; McLean, Michael B.; Jenkins, Mark W. & Rutherford, Brian Milne
Partner: UNT Libraries Government Documents Department
open access

2 x 2 Polyethylene Reflected and Moderated Highly Enriched Uranium System with Rhenium

Description: The 2 × 2 array HEU-Re experiment was performed on the Planet universal critical assembly machine on November 4th, 2003 at the Los Alamos Critical Experiments Facility (LACEF) at Los Alamos National Laboratory (LANL). For this experiment, there were 10 ½ units, each full unit containing four HEU foils and two rhenium foils. The top unit contained only two HEU foils and two rhenium foils. A total of 42 HEU foils were used for this experiment. Rhenium is a desirable cladding material for space nu… more
Date: September 1, 2010
Creator: Ellis, A. Nichole; Hutchinson, Jesson; Bess, John D.; Polyakov, Dmitry N.; Glushkov, Evgeny S. & Glushkov, Alexey E.
Partner: UNT Libraries Government Documents Department
open access

4-wave mixing for phase-matching free nonlinear optics in quantum cascade structures : LDRD 08-0346 final report.

Description: Optical nonlinearities and quantum coherences have the potential to enable efficient, high-temperature generation of coherent THz radiation. This LDRD proposal involves the exploration of the underlying physics using intersubband transitions in a quantum cascade structure. Success in the device physics aspect will give Sandia the state-of-the-art technology for high-temperature THz quantum cascade lasers. These lasers are useful for imaging and spectroscopy in medicine and national defense. Suc… more
Date: October 1, 2010
Creator: Chow, Weng Wah; Wanke, Michael Clement; Allen, Dan G.; Yang, Zhenshan & Waldmueller, Ines
Partner: UNT Libraries Government Documents Department
open access

6-D weak-strong beam-beam simulation study of proton lifetime in presence of head-on beam-beam compensation in the RHIC

Description: In this note we summarize the calculated particle loss of a proton bunch in the presence of head-on beam-beam compensation in the Relativistic Heavy Ion Collider (RHIC). To compensate the head-on beam-beam effect in the RHIC 250 GeV polarized proton run, we are introducing a DC electron beam with the same transverse profile as the proton beam to collide with the proton beam. Such a device is called an electron lens (e-lens). In this note we first present the optics and beam parameters and the t… more
Date: August 1, 2010
Creator: Luo, Y. & Fischer, W.
Partner: UNT Libraries Government Documents Department
open access

08-ERD-071 Final Report: New Molecular Probes and Catalysts for Bioenergy Research

Description: A major thrust in bioenergy research is to develop innovative methods for deconstructing plant cell wall polymers, such as cellulose and lignin, into simple monomers that can be biologically converted to ethanol and other fuels. Current techniques for monitoring a broad array of cell wall materials and specific degradation products are expensive and time consuming. To monitor various polymers and assay their breakdown products, molecular probes for detecting specific carbohydrates and lignins a… more
Date: March 7, 2011
Creator: Thelen, M. P.; Rowe, A. A.; Siebers, A. K. & Jiao, Y.
Partner: UNT Libraries Government Documents Department
open access

10 CFR 830 Major Modification Determination for Advanced Test Reactor LEU Fuel Conversion

Description: The Advanced Test Reactor (ATR), located in the ATR Complex of the Idaho National Laboratory (INL), was constructed in the 1960s for the purpose of irradiating reactor fuels and materials. Other irradiation services, such as radioisotope production, are also performed at ATR. The ATR is fueled with high-enriched uranium (HEU) matrix (UAlx) in an aluminum sandwich plate cladding. The National Nuclear Security Administration Global Threat Reduction Initiative (GTRI) strategic mission includes eff… more
Date: May 1, 2012
Creator: Christensen, Boyd D.; Lehto, Michael A. & Duckwitz, Noel R.
Partner: UNT Libraries Government Documents Department
open access

10 CFR 830 Major Modification Determination for Advanced Test Reactor RDAS and LPCIS Replacement

Description: The replacement of the ATR Control Complex's obsolete computer based Reactor Data Acquisition System (RDAS) and its safety-related Lobe Power Calculation and Indication System (LPCIS) software application is vitally important to ensure the ATR remains available to support this national mission. The RDAS supports safe operation of the reactor by providing 'real-time' plant status information (indications and alarms) for use by the reactor operators via the Console Display System (CDS). The RDAS … more
Date: May 1, 2012
Creator: Korns, David E.
Partner: UNT Libraries Government Documents Department
open access

10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement

Description: The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were v… more
Date: May 1, 2011
Creator: Duckwitz, Noel
Partner: UNT Libraries Government Documents Department
open access

10 CFR 830 Major Modification Determination for Replacement of ATR Primary Coolant Pumps and Motors

Description: The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were v… more
Date: May 1, 2011
Creator: Duckwitz, Noel
Partner: UNT Libraries Government Documents Department
open access

10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement

Description: Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100… more
Date: May 1, 2011
Creator: Duckwtiz, Noel
Partner: UNT Libraries Government Documents Department
open access

10 CFR 850 Implementation of Requirements

Description: 10 CFR 850 defines a contractor as any entity, including affiliated entities, such as a parent corporation, under contract with DOE, including a subcontractor at any tier, with responsibility for performing work at a DOE site in furtherance of a DOE mission. The Chronic Beryllium Disease Prevention Program (CBDPP) applies to beryllium-related activities that are performed at the Lawrence Livermore National Laboratory (LLNL). The CBDPP or Beryllium Safety Program is integrated into the LLNL Work… more
Date: January 5, 2012
Creator: Lee, S.
Partner: UNT Libraries Government Documents Department
open access

10-MW Supercritical-CO2 Turbine (Fact Sheet)

Description: National Renewable Energy Laboratory is one of the 2012 SunShot CSP R&D awardees for their advanced power cycles. This fact sheet explains the motivation, description, and impact of the project.
Date: September 2012
Partner: UNT Libraries Government Documents Department
open access

10 MW Supercritical CO2 Turbine Test

Description: The Supercritical CO2 Turbine Test project was to demonstrate the inherent efficiencies of a supercritical carbon dioxide (s-CO2) power turbine and associated turbomachinery under conditions and at a scale relevant to commercial concentrating solar power (CSP) projects, thereby accelerating the commercial deployment of this new power generation technology. The project involved eight partnering organizations: NREL, Sandia National Laboratories, Echogen Power Systems, Abengoa Solar, University of… more
Date: January 29, 2014
Creator: Turchi, Craig
Partner: UNT Libraries Government Documents Department
open access

14-plex Feasibility Report

Description: The Native Village of Unalakleet project was a feasibility study for a retrofit of a “tribally owned” three story, 14 apartment complex located in Unalakleet, Alaska. The program objective and overall goal was to create a plan for retrofitting to include current appraised value and comparable costs of new construction to determine genuine feasibility as low-income multi-family housing for tribal members.
Date: June 21, 2013
Creator: Kotongan, Victoria Hazel
Partner: UNT Libraries Government Documents Department
open access

17 GHz High Gradient Accelerator Research

Description: This is a report on the MIT High Gradient Accelerator Research program which has included: Operation of the 17 GHz, 25 MeV MIT/Haimson Research Corp. electron accelerator at MIT, the highest frequency, stand-alone accelerator in the world; collaboration with members of the US High Gradient Collaboration, including the design and test of novel structures at SLAC at 11.4 GHz; the design, construction and testing of photonic bandgap structures, including metallic and dielectric structures; the inv… more
Date: July 10, 2013
Creator: Temkin, Richard J. & Shapiro, Michael A.
Partner: UNT Libraries Government Documents Department
open access

20% Wind by 2030: Overcoming the Challenges in West Virginia

Description: Final Report for '20% Wind by 2030: Overcoming the Challenges in West Virginia'. The objective of this project was to examine the obstacles and constraints to the development of wind energy in West Virginia as well as the obstacles and constraints to the achievement of the national goal of 20% wind by 2030. For the portion contracted with WVU, there were four tasks in this examination of obstacles and constraints. Task 1 involved the establishment of a Wind Resource Council. Task 2 involved con… more
Date: February 15, 2012
Creator: Mann, Patrick & Risch, Christine
Partner: UNT Libraries Government Documents Department
open access

25 Year Lifetime for Flexible Buildings Integrated Photovoltaics

Description: Although preliminary proof-of-principle of the efficacy of barrier materials and processes, first developed by Battelle at PNNL and commercialized by Vitex, has been demonstrated at the laboratory scale, there are several challenges to the practical commercial implementation of these developments in the Buildings Integrated Photovoltaics (BIPV) market. Two important issues that are addressed in this project are identifying a low cost substrate material that can survive in the outside environmen… more
Date: July 10, 2010
Creator: Gross, Mark E.
Partner: UNT Libraries Government Documents Department
open access

100 Area D4 Project Building Completion Report: December 2008 to December 2009

Description: This report documents the final status of buildings after the completion of D4 activities at the 100 Area of the U.S. Department of Energy Hanford Site from December 1, 2008, to December 31, 2009.
Date: October 26, 2010
Creator: K.G. Finucane, J.P. Harrie
Partner: UNT Libraries Government Documents Department
open access

100-B/C Target Analyte List Development for Soil

Description: This report documents the process used to identify source area target analytes in support of the 100-B/C remedial investigation/feasibility study addendum to DOE/RL-2008-46. This report also establishes the analyte exclusion criteria applicable for 100-B/C use and the analytical methods needed to analyze the target analytes.
Date: March 18, 2010
Creator: Ovink, R.W.
Partner: UNT Libraries Government Documents Department
open access

100-BC-5 Operable Unit, Batch Leach Analyses and Report for Sediments at RI/FS Wells C7508, C7783, C7784, C7785, and C7787

Description: This is an analytical data report for sediment samples from the 100 BC Operable unit. This report contains the updated dates for samples associated with Hexavalent Chromium/Soil analysis. Between August 24, 2010 and March 3, 2011 sediment samples were received from 100-BC Decision Unit Soil for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Labo… more
Date: April 2011
Creator: Lindberg, Michael J.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen