Search Results

Primary view of FUDGE 4A: A Computer Program for Gamma Dose Rate Distribution from Rectangular Sources
Galanter, Leonard & Krishnamurthy, Krishnaswamy
August 1968
Primary view of Power Plant Operating and Maintenance Costs
Susskind, H. & Raseman, C. J.
April 1970
Primary view of Operating Manual for the PSE&G Hydrogen Reservoir Containing Iron Titanium Hydride
Strickland, G. & Reilly, J. J.
February 1974
Primary view of High-Pressure Gamma Loop for Brookhaven National Laboratory
Brookhaven National Laboratory
June 1963
Primary view of Shipboard Cobalt-60 Radiopasteurizer for Marine Products
Manowitz, B.; Kuhl, A. O.; Galanter, L.; Armel, J.; Black, K. M.; Klaassen, W. J. et al.
June 30, 1963
Primary view of Brookhaven National Laboratory Annual Report: 1961
Brookhaven National Laboratory
November 1961
Primary view of Progress Report on Waste Concentration Studies: Engineering Results on the BNL Semi-Works Vapor Filtration Vapor Compression Evaporator
Horrigan, R. V.; Fried, H. M.; Manowitz, B.; Kuhl, O.; Baranosky, J. A.; Bellanca, S. et al.
August 15, 1951
Primary view of The Area Survey Manual of Brookhaven National Laboratory: Area Radiation Detection Instrumentation, Maintenance, and Results
Weiss, Max M.
January 1, 1952
Primary view of Non-Overload Amplifiers
Higinbotham, W. A.
April 1, 1953
Primary view of Brookhaven National Laboratory Annual Report: 1956
Brookhaven National Laboratory
April 1957
Primary view of Brookhaven National Laboratory Annual Report: 1958
Brookhaven National Laboratory
February 1959
Primary view of Brookhaven National Laboratory Annual Report: 1960
Brookhaven National Laboratory
April 1961
Primary view of Brookhaven National Laboratory Annual Report: 1954
Brookhaven National Laboratory
March 1955
Primary view of Area Survey Manual
Weiss, Max M.
June 15, 1955
Primary view of LMFR-9 Static Corrosion Behavior of Materials in Bismuth and Uranium-Bismuth Solution at 550°C
Atherton, J. E.; Kammerer, O. F.; Klamut, C. J. & Sadofsky, J.
August 1954
Primary view of Twin Channel Count Integrator (EH1-503)
Higinbotham, William A. & Tillinger, J.
June 1956
Primary view of Analysis of Meteorological Tower Data, April 1950 - March 1952, Brookhaven National Laboratory
Singer, Irving A. & Raynor, Gilbert S.
June 1957
Primary view of Pilot Plant Fluorination of Uranium Fuel Elements by Bromine Trifluoride
Strickland, G.; Horn, F. L. & Johnson, R.
July 26, 1957
Primary view of Capture - Positron Ratios for Allowed and First-Forbidden Transitions
Perlman, M. L. & Wolfsberg, Max
January 1958
Primary view of Description of Facilities and Mechanical Components: Medical Research Reactor (MRR)
Godel, Jules B.
February 1960
Primary view of A Review of the Utilization of Fission Fragment Energy for the Fixation of Nitrogen
Steinberg, Meyer; Powell, J. R. & Green, Leon
January 17, 1961
Primary view of Liquid Metal Fuel Reactor: Four-Inch Utility Test Loop: Design, Construction, Operation, and Experimental Results
Hoffman, K. C.; Isler, R. J.; Scarlett, C. H. & Schoener, G. A.
July 14, 1960
Primary view of Uranium-Bismuth In-Pile Corrosion Test Loop: Radiation Loop No. 1
Waide, C. H.; Kukacka, L. E.; Meyer, R. A.; Milau, J.; Klein, J. H.; Chow, J. G. Y. et al.
May 1961
Primary view of Cobalt-60 Bulk Grain Irradiator: Study Report
Brookhaven National Laboratory
June 30, 1963
Back to Top of Screen