Search Results

Primary view of Investigations of an Annular Diffuser-Fan Combination Handling Rotating Flow
Schwartz, Ira R.
April 25, 1949
Primary view of Investigation of a Two-Step Nozzle in an 11-Inch Hypersonic Tunnel
McLellan, Charles H.; Williams, Thomas W. & Bertram, Mitchel H.
October 25, 1949
Primary view of A preliminary experimental investigation of a submerged cascade inlet
Christiani, R. Duane & Randall, Lauros M.
March 25, 1949
Primary view of Equilibrium Operating Performance of Axial-Flow Turbojet Engines by Means of Idealized Analysis
Sanders, John C. & Chapin, Edward C.
February 25, 1949
Primary view of The effect of blade-section thickness ratio on the aerodynamic characteristics of related full-scale propellers at Mach numbers up to 0.65
Maynard, Julian D. & Steinberg, Seymour
April 25, 1949
Primary view of General algebraic method applied to control analysis of complex engine types
Boksenbom, Aaron S. & Hood, Richard
April 25, 1949
Primary view of Flight Investigation of 6.25-Inch-Diameter Deacon Rocket and 10-Inch-Scale Model Rocket
Watson, R. S.
March 25, 1949
Primary view of Performance of Single-Stage Turbine of Mark 25 Torpedo Power Plant with Two Special Nozzles 2 - Efficiency with 20 Degrees-Inlet-Angle Rotor Blades
Schum, Harold J. & Whitney, Warren J.
August 25, 1949
Primary view of An Investigation of a Full-Scale Model of the Republic XF-91 Airplane in the Ames 40- By 80-Foot Wind Tunnel: Pressure Data
Hunton, Lynn W. & Dew, Joseph K.
March 25, 1949
Primary view of Spin and Recovery Characteristics of the Northrop XF-89 Airplane
Berman, Theodore
February 25, 1949
Primary view of Performance of supersonic axial-flow compressors based on one-dimensional analysis
Wright, Linwood C. & Klapproth, John F.
March 25, 1949
Primary view of Sonic decontamination
Brodbeck, R. M. & Schommer, G. R.
January 25, 1949
Primary view of Radioactive decontamination of metals by electropolishing
Brodbeck, R. M. & Schommer, G. R.
January 25, 1949
Primary view of Progress Report Number 9. April 16, 1949 - May 15, 1949
Gibb, Thomas R. P., Jr.
May 25, 1949
Primary view of A high resolution scale-of-four
Fitch, V.
August 25, 1949
Primary view of MATERIALS TESTING REACTOR PROJECT. ADDENUM TO REACTOR BUILDING WING REPORT. Design Report No. 27A
Link, L.E. & Guzik, R.F.
November 25, 1949
Primary view of FABRICATION OF URANIUM WIRE
Anderson, R.E.; Taub, J.M. & Doll, D.T.
October 25, 1949
Primary view of Fabrication of Uranium Wire
Anderson, R. E.; Taub, J. M. & Doll, D. T.
October 25, 1949
Primary view of Corrosion Tests on Tantalum, Hastelloy C and Duriron in 234-5 Project Solutions
Work, J. B. & Koenig, W. W.
February 25, 1949
Primary view of Direct Current Electromagnetic Pumps
Barnes, A. H.; Smith, F. A. & Whitham, G. K.
October 25, 1949
Primary view of Materials Testing Reactor Project : Addendum to Reactor Building Wing Report, Design Report No. 27A
Link, L. E. & Guzik, R. F.
November 25, 1949
Primary view of [Parts Pix for Bruce Howard]
WBAP-TV (Television station : Fort Worth, Tex.)
May 25, 1949
Primary view of [Pi-Do commercial being filmed]
WBAP-TV (Television station : Fort Worth, Tex.)
October 25, 1949
Primary view of [Pi-Do commercial filming]
WBAP-TV (Television station : Fort Worth, Tex.)
October 25, 1949
Back to Top of Screen