Search Results

open access

Report on decreasing available acceleration of 190-B process pump turbines in order to reduce emergency steam demand

Description: As originally installed, the primary process pump turbines in 190-B were arranged to accelerate considerably upon loss of BPA electric power supply to the Process Pump House. However, the acceleration comes too late to be of value in maintaining top of riser pressure within the first second or two, and the acceleration results only in maintaining final process water pressure and flow at values higher than needed. It is desired to limit the acceleration of the turbines to a relatively small amou… more
Date: December 28, 1951
Partner: UNT Libraries Government Documents Department
open access

Capacity survey -- Separations Division

Description: Recent tentative production forecasts indicate that as much as 96.6 Kg plutonium, associated with 190 tons uranium, may be produced each month. The ability of the Separations facilities to process these materials is herein summarized. The Redox Production Plant capacity has been reasonably predicted at about 112 tons uranium per month; this rate assumes only that critical mass control is achieved by the limitation of the possible volume accumulation at any point, and that the product concentrat… more
Date: June 28, 1951
Creator: Frame, J. M. & Tomlinson, R. E.
Partner: UNT Libraries Government Documents Department
open access

Expansion of Hanford Works facilities

Description: This report discusses the feasibility of designing and building two 100 Areas at the Coyote Rapids site on the Columbia River. It incorporates the individual studies prepared by the Power and Mechanical Division-HDC-2241, Reactor Division-HDC-2239, Project Engineering Division-HDC-2244, Principal Engineer and HDC-2242, and the Engineering and Construction Services Division-HDC-2243, each outlining the proposed course of action and requirements for that facet of the contemplated work in which th… more
Date: June 28, 1951
Creator: Parker, J. S.
Partner: UNT Libraries Government Documents Department
open access

An Ion Exchange Study of Possible Hydridized 5f Bonding in theActinides

Description: A study has been made of the elution behavior of curium(III), americium(III), plutonium(III), actinium(III), plutonium(IV), neptunium(IV), uraniuM(IV), thorium(IV), neptunium(V), plutonium (VI), uranium (VI), lanthanum(III), cerium(III), europium(III), ytterbium(III), ytterium(III), strontium(II), barium(II), radium(II), cesium(I) with 3.2 M, 6.2 M, 9.3 M, and 12.2 M HCl solutions from Dowex-50 cation exchange resin columns. These elutions show that in high concentrations of hydrochloric acid t… more
Date: August 28, 1951
Creator: Diamond, R. M.; Street, Jr., K. & Seaborg, G. T.
Partner: UNT Libraries Government Documents Department
open access

High Energy Proton Spallation -- Fission of Uranium

Description: The fission and spallation reactions caused in uranium by bombardment with high energy protons (340 t o 350 MeV) were investigated. The reaction products were separated from the target by chemical processes and identified by their radioactive properties. The relative yields of the observed fission products were measured, and the results plotted as a function of mass number. Several of the spallation products were identified and their yields estimated. An attempt was made to determine the most p… more
Date: May 28, 1951
Creator: Folger, R. L.; Stevenson, P. C. & Seaborg, G. T.
Partner: UNT Libraries Government Documents Department
open access

Slow Neutron Velocity Spectrometer Transmission Studies of Pu

Description: The slow neutron transmission of several samples of plutonium is being investigated with the Columbia Neutron Velocity Spectrometer. The spectrometer, which has been described previously (Rainwater et al., Phys. Rev. 71, 65 (1947)), was recently improved, recalibrated, and the operational factor reevaluated (CUD-59). Results reported here were obtained by the procedure described in that report.
Date: May 28, 1951
Creator: Havens, W. W., Jr.; Melkonian, E.; Rainwater, L. J. & Levin, M.
Partner: UNT Libraries Government Documents Department
open access

Addition of standard quantities of chemicals in certain reduction operations in the 234-5 Building

Description: A proposal by ``S`` Division that operations be simplified by adding fixed amounts of calcium and iodine in the reduction step as a time saving device has been investigated. Ten test runs in the 410--430 gram range have been compared with twenty normal runs made in this period. The average yields were 98.27% for the normal method and 98.26% for the test runs. No effect on individual yields by the variance in percent calcium and the iodine ratio was observed. Seventy percent of the runs normally… more
Date: September 28, 1951
Creator: Desposato, F.E.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen