Search Results

Advanced search parameters have been applied.
open access

HGP-A wellhead generator proof-of-feasibility project

Description: The HGP-A Wellhead Generator Proof-of-Feasibility Project consists of a nominal 3 Megawatt geothermal steam turbine electric power generating facility, the first geothermal power plant in Hawaii. The plant is being constructed as a research and development project to evaluate geothermal steam as a viable resource to be considered for larger commercial electric power generating stations in Hawaii. The project facilities include a turbine building, with a contiguous service area for plant operati… more
Date: November 3, 1978
Partner: UNT Libraries Government Documents Department
open access

Performance and operability study of the Raft River 5 MW(e) pilot geothermal power plant steady-state behavior

Description: Estimates of the steady-state performance of the Raft River 5 MW(e) Pilot Geothermal Power Plant have been made using an existing digital computer simulation which has been updated to reflect the individual performance of the actual components in the plant. The plant output (gross and net) has been obtained as a function of geothermal fluid inlet temperature and flow rate and isobutane preheater bypass (boiler inlet subcooling). The plant performance has been determined for two ambient conditio… more
Date: November 13, 1979
Creator: Bliem, C.J.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen