Search Results

open access

Only source of energy

Description: Various plants that might play a role in the energy mix of the future are discussed and illustrated. Included among them are the Euphorbias and Guayule. (JGB)
Date: March 22, 1978
Creator: Calvin, G. J. & Calvin, M.
Partner: UNT Libraries Government Documents Department
open access

Trenton ICES: demonstration of a grid connected integrated community energy system. Phase II. Volume 3. Preliminary design of ICES system and analysis of community ownership: computer printouts

Description: This volume supplements Vol. 2 and consists entirely of computer printouts. The report consists of three parts: (1) hourly log of plant simulation based on 1982 ICES Community, with thermal storage, on-peak and off-peak electric generation, and 80% maximum kW trip-off; (2) same as (1) except without thermal storage; and (3) hourly load and demand profiles--1979, 1980, and 1982 ICES communities.
Date: March 22, 1978
Partner: UNT Libraries Government Documents Department
open access

Trenton ICES: demonstration of a grid-connected integrated community energy system. Phase II. Volumes 1 and 2. Preliminary design of ICES system and analysis of community ownership

Description: Preliminary design and evaluation for the system has been carried out. The findings of this study are: (1) it is technically feasible, utilizing commercially available hardware; (2) under utility ownership and operation, it will not be economically competitive with conventional alternatives for heating and cooling buildings (analysis contained in companion report under separate cover); (3) under utility ownership and operation, no restrictions have been identified that would prevent the project… more
Date: March 22, 1978
Partner: UNT Libraries Government Documents Department
open access

Grid connected integrated community energy system. Phase II: final state 2 report. Preliminary design waste management and institutional analysis

Description: The Preliminary Design of a Regional, Centralized Solid Waste Management System for the Twin Cities Metropolitan Region in Minnesota is presented. The concept has been developed for the sound environmental and safe disposal of solid waste generated from its health care industry, although some additional waste supplements are included as economic assistance in order to approach a competitive alternative to current health care solid waste disposal costs. The system design focuses on a 132 tons pe… more
Date: March 22, 1978
Partner: UNT Libraries Government Documents Department
open access

Grid-connected integrated community energy system. Phase II, Stage 2, final report. Executive summary

Description: The University of Minnesota Grid-ICES was divided into four identifiable programs in order to study the feasibility of each of the parts of the ICES independently. The total program involves cogeneration, fuel conversion, fuel substitution, and energy conservation by system change. This Phase II report substantiates the theory that the Basic Grid ICES is not only energy-effective, but it will become cost effective as unit operating costs adjust to supply and demand in the 1980's. The Basic Prog… more
Date: March 22, 1978
Partner: UNT Libraries Government Documents Department
open access

HEAL G-C ICES, Phase II: detailed feasibility analysis and preliminary design. Final report, Stage 1

Description: In this preliminary report for Phase II of Health Education Authority of Louisiana's (HEAL) ICES program, specific elements of the basic intitutional issues were readdressed, as requested by the U.S. Department of Energy. The draft environmental assessment was reassessed and updated. Thermal energy demand profiles for the major community sectors, i.e., the five institutions comprising the HEAL Complex, were refined on a month-by-month basis and resulted in establishing ICES plant systems design… more
Date: March 22, 1978
Partner: UNT Libraries Government Documents Department
open access

Trenton ICES: demonstration of a grid-connected integrated community energy system. Phase II. Volume I. Final report

Description: This draft report summarizes an economic analysis based upon the assumption of Public Service Electric and Gas Company's ownership and operation of the ICES plant and distribution system. Therefore, the parameters of the analysis are PSE and G's standard engineering practices, standard instrumentation and controls design, standard operating procedures, and standard estimating methods. The value of electric energy was assumed to be the Pennsylvania-Jersey-Maryland Power Interconnection off-peak … more
Date: March 22, 1978
Partner: UNT Libraries Government Documents Department
open access

Grid-connected integrated community energy system. Phase II, Stage 2, final report. Preliminary design pyrolysis facility. [Andco-Torrax system]

Description: The University of Minnesota is studying and planning a grid connected integrated community energy system to include disposal of wastes from health centers and utilizing the heat generated. The University of Minnesota has purchased the so called Southeast Generating Station from the Northern States Power Company. This plant contains two coal-fired boilers that will be retrofitted to burn low-sulfur Montana coal. Building modifications and additions will be made to support the components of the A… more
Date: March 22, 1978
Partner: UNT Libraries Government Documents Department
open access

Grid connected integrated community energy system. Phase II: final stage 2 report. Outline specifications of cogeneration plant; continued

Description: Specifications are presented for the electrical equipment, site preparation, building construction and mechanical systems for a dual-purpose power plant to be located on the University of Minnesota campus. This power plant will supply steam and electrical power to a grid-connected Integrated Community Energy System. (LCL)
Date: March 22, 1978
Partner: UNT Libraries Government Documents Department
open access

Grid connected integrated community energy system. Phase II: final stage 2 report. Finance plan, capital costs and institutional analysis

Description: The development of a grid-connected Integrated Community Energy System (ICES) is described. This system will supply electric power to the Northern States Power Co. in Minnesota and steam for the University of Minnesota, Augsburg College, two Minneapolis hospitals, and the Dept. of Health building. The fossil-fuel power plant would be located on the University of Minnesota campus. The costs, financing, and legal agreements involved in this project are presented and discussed. (LCL)
Date: March 22, 1978
Partner: UNT Libraries Government Documents Department
open access

Grid connected integrated community energy system. Phase II: final stage 2 report. Outline specifications of cogeneration plant

Description: Specifications are presented for major components of the dual-purpose power plant to be located on the University of Minnesota campus. This power plant will supply steam and electric power to a proposed grid-connected Integrated Community Energy System. The capital costs and capital budget for the power plant and specifications for auxiliary equipment, such as the interconnecting heat tunnel, are included. (LCL)
Date: March 22, 1978
Partner: UNT Libraries Government Documents Department
open access

Grid connected integrated community energy system. Phase II: final stage 2 report. Preliminary design of cogeneration plant

Description: The preliminary design of a dual-purpose power plant to be located on the University of Minnesota is described. This coal-fired plant will produce steam and electric power for a grid-connected Integrated Community Energy System. (LCL)
Date: March 22, 1978
Partner: UNT Libraries Government Documents Department
open access

Grid connected integrated community energy system. Phase II: final state 2 report. Cost benefit analysis, operating costs and computer simulation

Description: A grid-connected Integrated Community Energy System (ICES) with a coal-burning power plant located on the University of Minnesota campus is planned. The cost benefit analysis performed for this ICES, the cost accounting methods used, and a computer simulation of the operation of the power plant are described. (LCL)
Date: March 22, 1978
Partner: UNT Libraries Government Documents Department
Back to Top of Screen