TANK 18-F AND 19-F TANK FILL GROUT SCALE UP TEST SUMMARY

Description: High-level waste (HLW) tanks 18-F and 19-F have been isolated from FTF facilities. To complete operational closure the tanks will be filled with grout for the purpose of: (1) physically stabilizing the tanks, (2) limiting/eliminating vertical pathways to residual waste, (3) entombing waste removal equipment, (4) discouraging future intrusion, and (5) providing an alkaline, chemical reducing environment within the closure boundary to control speciation and solubility of select radionuclides. Thi… more
Date: January 3, 2012
Creator: Stefanko, D. & Langton, C.
Partner: UNT Libraries Government Documents Department
open access

SAVANNAH RIVER SITE R REACTOR DISASSEMBLY BASIN IN SITU DECOMMISSIONING

Description: The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate in tact, structurally sound facilities that are no longer needed for their original purpose of, i.e., generating (reactor facilities), processing(isotope separation facilities) or storing radioactive materials. The 105-R Disassembly Basin is the first SRS reactor facility to undergo the in-situ decommissioning (ISD) process. This ISD process complies with the105-R Disassembly Basin project strat… more
Date: December 3, 2009
Creator: Langton, C.; Blankenship, J.; Griffin, W. & Serrato, M.
Partner: UNT Libraries Government Documents Department