CEMENTITIOUS GROUT FOR CLOSING SRS HIGH LEVEL WASTE TANKS - #12315

Description: In 1997, the first two United States Department of Energy (US DOE) high level waste tanks (Tanks 17-F and 20-F: Type IV, single shell tanks) were taken out of service (permanently closed) at the Savannah River Site (SRS). In 2012, the DOE plans to remove from service two additional Savannah River Site (SRS) Type IV high-level waste tanks, Tanks 18-F and 19-F. These tanks were constructed in the late 1950's and received low-heat waste and do not contain cooling coils. Operational closure of Tank… more
Date: January 10, 2012
Creator: Langton, C.; Burns, H. & Stefanko, D.
Partner: UNT Libraries Government Documents Department
open access

USE OF CEMENTITIOUS MATERIALS FOR SRS REACTOR FACILITY IN-SITU DECOMMISSIONING - 11620

Description: The United States Department of Energy (US DOE) concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate in tact, structurally sound facilities that are no longer needed for their original purpose of, i.e., producing (reactor facilities), processing (isotope separation facilities) or storing radioactive materials. The Savannah River Site 105-P and 105-R Reactor Facility ISD requires about 250,000 cubic yards of grout to fill the below grade structure. The fills … more
Date: December 7, 2010
Creator: Langton, C.; Stefanko, D.; Serrato, M.; Blankenship, J.; Griffin, W.; Waymer, J. et al.
Partner: UNT Libraries Government Documents Department
open access

SAVANNAH RIVER SITE R REACTOR DISASSEMBLY BASIN IN SITU DECOMMISSIONING

Description: The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate in tact, structurally sound facilities that are no longer needed for their original purpose of, i.e., generating (reactor facilities), processing(isotope separation facilities) or storing radioactive materials. The 105-R Disassembly Basin is the first SRS reactor facility to undergo the in-situ decommissioning (ISD) process. This ISD process complies with the105-R Disassembly Basin project strat… more
Date: December 3, 2009
Creator: Langton, C.; Blankenship, J.; Griffin, W. & Serrato, M.
Partner: UNT Libraries Government Documents Department
open access

NEW MATERIALS DEVELOPED TO MEET REGULATORY AND TECHNICAL REQUIREMENTS ASSOCIATED WITH IN-SITU DECOMMISSIONING OF NUCLEAR REACTORS AND ASSOCIATED FACILITIES

Description: For the 2010 ANS Embedded Topical Meeting on Decommissioning, Decontamination and Reutilization and Technology, Savannah River National Laboratory's Mike Serrato reported initial information on the newly developed specialty grout materials necessary to satisfy all requirements associated with in-situ decommissioning of P-Reactor and R-Reactor at the U.S. Department of Energy's Savannah River Site. Since that report, both projects have been successfully completed and extensive test data on both … more
Date: January 18, 2012
Creator: Blankenship, J.; Langton, C.; Musall, J. & Griffin, W.
Partner: UNT Libraries Government Documents Department
open access

Computation at the edge of chaos: Phase transition and emergent computation

Description: In order for computation to emerge spontaneously and become an important factor in the dynamics of a system, the material substrate must support the primitive functions required for computation: the transmission, storage, and modification of information. Under what conditions might we expect physical systems to support such computational primitives This paper presents research on Cellular Automata which suggests that the optimal conditions for the support of information transmission, storage, a… more
Date: January 25, 1990
Creator: Langton, C.
Partner: UNT Libraries Government Documents Department
open access

Assessment of the Potential for Hydrogen Generation During Deactivation and Decommissioning of Reactor Vessels at the Savannah River Site

Description: The R- and P-reactor vessels at the Savannah River Site (SRS) are being prepared for deactivation and decommissioning (D&D). D&D activities will consist primarily of physically isolating and stabilizing the reactor vessel by filling it with a grout material. The reactor vessels contain aluminum alloy materials, which pose a concern in that aluminum corrodes rapidly when it comes in contact with the alkaline grout. A product of the corrosion reaction is hydrogen gas and therefore potenti… more
Date: November 10, 2010
Creator: Wiersma, B.; Serrato, M. & Langton, C.
Partner: UNT Libraries Government Documents Department
open access

CEMENTITIOUS BARRIERS PARTNERSHIP ACCOMPLISHMENTS AND RELEVANCE TO THE DOE COMPLEX

Description: The Cementitious Barriers Partnership (CBP) was initiated to reduce risk and uncertainties in the performance assessments that directly impact U.S. Department of Energy (DOE) environmental cleanup and closure programs. The CBP is supported by the DOE Office of Environmental Management (DOE-EM) and has been specifically addressing the following critical EM program needs: (i) the long-term performance of cementitious barriers and materials in nuclear waste disposal facilities and (ii) increased u… more
Date: November 15, 2010
Creator: Burns, H.; Langton, C.; Flach, G. & Kosson, D.
Partner: UNT Libraries Government Documents Department
open access

CONSIDERATIONS FOR GROUT FORMULATIONS FOR FACILITY CLOSURES USING IN SITU STRATEGIES

Description: The U.S. Department of Energy (DOE) is conducting in situ closures (entombment) at a large number of facilities throughout the complex. Among the largest closure actions currently underway are the closures of the P and R Reactors at the Savannah River Site (SRS), near Aiken, South Carolina. In these facilities, subgrade open spaces are being stabilized with grout; this ensures the long term structural integrity of the facilities and permanently immobilizes and isolates residual contamination. T… more
Date: August 25, 2010
Creator: Gladden, J.; Serrato, M.; Langton, C.; Long, T.; Blankenship, J.; Hannah, G. et al.
Partner: UNT Libraries Government Documents Department
open access

The Cementitious Barriers Partnership (CBP) Software Toolbox Capabilities In Assessing The Degradation Of Cementitious Barriers

Description: The Cementitious Barriers Partnership (CBP) Project is a multi-disciplinary, multi-institutional collaboration supported by the U.S. Department of Energy (US DOE) Office of Tank Waste and Nuclear Materials Management. The CBP program has developed a set of integrated tools (based on state-of-the-art models and leaching test methods) that help improve understanding and predictions of the long-term structural, hydraulic and chemical performance of cementitious barriers used in nuclear application… more
Date: January 11, 2013
Creator: Flach, G. P.; Burns, H. H.; Langton, C.; Smith, F. G., III; Brown, K. G.; Kosson, D. S. et al.
Partner: UNT Libraries Government Documents Department