Hot Dry Rock Energy Annual Report Fiscal Year 1992
Description:
Hot Dry Rock technology took a giant leap forward this year as the long-awaited long-term flow test (LTFT) of the Phase II HDR reservoir at Fenton Hill got underway. Energy was produced on a twenty-four hour a day basis for a continuous period of nearly four months of steady-state testing. Hot water was brought to the surface at 90-100 gallons per minute (gpm) with temperatures of 180[degrees]C (356[degrees]F) and higher. During that time, the HDR plant achieved an on-line record of 98.8%. Surf…
more
Date:
April 1993
Creator:
Winchester, Willanne W. & Bigio, Ruth
Item Type:
Refine your search to only
Report
Partner:
UNT Libraries Government Documents Department