Search Results

open access

Annual Hanford Seismic Report for Fiscal Year 2007

Description: This annual report documents the locations, magnitudes, and geologic interpretations of earthquakes recorded for the Hanford monitoring region of south-central Washington in fiscal year 2007 (October 2006 through September 2007). The report provides summaries of seismic events recorded during the first three quarters of fiscal year 2007 and contains a more comprehensive discussion of seismic events for the fourth quarter of the fiscal year.
Date: December 27, 2007
Creator: Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E. & Devary, Joseph L.
Partner: UNT Libraries Government Documents Department
open access

FY07 Final Report for Calibration Systems

Description: Remote infrared (IR) sensing provides a valuable method for detection and identification of materials associated with nuclear proliferation. Current challenges for remote sensors include minimizing the size, mass, and power requirements for cheaper, smaller, and more deployable instruments without affecting the measurement performance. One area that is often overlooked is sensor calibration design that is optimized to minimize the cost, size, weight, and power of the payload. Yet, an on-board c… more
Date: December 1, 2007
Creator: Myers, Tanya L.; Broocks, Bryan T.; Cannon, Bret D. & Ho, Nicolas
Partner: UNT Libraries Government Documents Department
open access

Federal R&D Funding Under a Continuing Resolution

Description: This report discusses the continuing resolution, or CR (P.L. 109-383, H.J.Res. 102) which provides spending at FY2006 levels (through February 15, 2007), for those agencies lacking enacted FY2007 appropriations bills.
Date: December 14, 2006
Creator: Davey, Michael E.
Partner: UNT Libraries Government Documents Department
open access

Interior, Environment, and Related Agencies: FY2007 Appropriations

Description: This report is a guide to one of the regular appropriations bills that Congress considers each year. It summarizes the status of the Interior, Environment, and Related Agencies appropriations bill, its scope, major issues, funding levels, and related congressional activity.
Date: December 1, 2006
Creator: Vincent, Carol H.; Bearden, David M.; Corn, M. L.; Gorte, Ross W.; Humphries, Marc; Sheikh, Pervaze A. et al.
Partner: UNT Libraries Government Documents Department
open access

HYBRID SULFUR ELECTROLYZER DEVELOPMENT, NHI WORK PACKAGE N-SR07TC0301, FY07 FIRST QUARTER REPORT

Description: The proof of concept of SO2 electrolysis for the hybrid sulfur (HyS) process is the second priority research target of the DOE Nuclear Hydrogen Initiative's thermochemical program for FY07. The proof of concept of the liquid-phase option must be demonstrated at the single cell level for an extended run times (>100 hours). The rate of development of HyS will depend on the identification of a promising membrane or an alternative means for controlling sulfur formation. Once successful long-dura… more
Date: December 20, 2006
Creator: Summers, W
Partner: UNT Libraries Government Documents Department
open access

FY07 I/O Integration Blueprint

Description: This document provides an understanding of the near and long term computing and I/O resources in the Secure Computing Facility (SCF) and Open Computing Facility (OCF). Requirements for data flows, storage capacities and transfer rates are determined. Recommendations are made for architectures, timeframes for major deliverables, and procurements for the next fiscal year.
Date: December 28, 2006
Creator: Wiltzius, D P & Gary, M R
Partner: UNT Libraries Government Documents Department
open access

Technical Issues Map for the NHI System Interface and Support Systems Area: 1st Quarter FY 07

Description: This document provides a mapping of technical issues associated with development of the Next Generation Nuclear Plant (NGNP) intermediate heat transport loop and nuclear hydrogen plant support systems to the work that has been accomplished or is currently underway. The technical issues are ranked according to priority and by assumed resolution dates. Due to funding limitations, not all high-priority technical issues are under study at the present time, and more resources will need to be dedicat… more
Date: December 1, 2006
Creator: Sherman, Steven R.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen