Production Test 105-533-A -- Supplement C, Local controlled increases in C-Pile tube powers
Description:
Production Test 105--533-A and Supplements A and B which authorize an ``experimental area`` in C-pile in which the tube power limits are relaxed to allow tube power increases up to 16-2/3 per cent above the maximum allowed tube power outside of the experimental area. Supplement B (HW-28775) further limits the maximum tube power to 820 kw. The planned increase of tube powers at C-Pile (from 700 kw/tube to 800 kw/tube) for the tubes outside of the experimental area will cause the experimental are…
more
Date:
December 29, 1953
Creator:
Brugge, B. O.
Partner:
UNT Libraries Government Documents Department