This system will be undergoing maintenance May 23rd between 9:00AM and 12:00PM CDT.

Search Results

Advanced search parameters have been applied.
Primary view of Fuel pin fabrication for the FFTF
Williams, J.F. & Rice, L.H.
January 1, 1980
Primary view of LOFT Vital MG Set transient parameter review
Kranning, A.N.
September 12, 1978
Primary view of Stress analysis of conical flued heads for FFTF liquid metal piping anchors
Sampson, R. C.
March 1, 1979
Primary view of Closed Loop In-Reactor Assembly (CLIRA): a fast flux test facility test vehicle
Oakley, D.J.
September 12, 1978
Primary view of LOFT CIS analysis: 1''-PCC-76-A inside containment penetration S-1A. Internal technical report
Nitzel, M.E.
December 11, 1978
Primary view of LOFT reactor advanced instrumented center fuel bundle
Howell, T. E. & Selcho, H. S.
January 1, 1979
Primary view of FFTF regulatory review for operating authorization
Schade, A. R. & Simpson, D. E.
January 1, 1979
Primary view of Instrument calibration program for startup on FFTF
Swanson, C. D.
June 1, 1979
Primary view of DALIS: a computer-assisted document retrieval system for the FFTF
Harves, W G
May 12, 1981
Primary view of Structural material irradiations in FFTF
unknown creator
January 1, 1985
Primary view of Experience in the use of FBR core component structural design criteria as applied to FFTF
Hecht, S.L.
January 1, 1979
Primary view of Experience with simplified inelastic analysis of FFTF test assemblies
Winkel, B. V.
February 1, 1979
Primary view of High temperature testing of a sodium pump. ASME Publication No. 78-WA/NE-12
Atz, R.W. & Tessier, M.J.
January 1, 1978
Primary view of Handling of sodium for the FFTF
Ballif, J.L. & Meadows, G.E.
June 1, 1978
Primary view of Investigation of effect of single phase electrical faults at LOFT
Yeates, J. A.
September 28, 1978
Primary view of Integrated leak rate testing of the fast flux test facility reactor containment building
James, E. B.; Farabee, O. A. & Bliss, R. J.
January 1, 1978
Primary view of LOFT CIS Analysis Line 2 inches-IA-298-AB outside containment penetration S-2A
Pierce, A.T.
September 12, 1978
Primary view of Low-Enrichment Fuel Development Program
Stahl, D.
January 1, 1978
Primary view of FFTF EM service pump design, application, and testing
Jacobson, G.; Carter, E. H.; Hallinan, G. J. & Eichelberger, R. L.
January 1, 1977
Primary view of Benchmark revisited: the accuracy of finite difference methods and the potential for the use of nodal methods in the analyses of research and test reactors
Woodruff, W.L.
January 1, 1985
Primary view of Oak Ridge Research Reactor shutdown maintenance and surveillance
Coleman, G.H. & Laughlin, D.L.
October 1, 1990
Primary view of LOFT CIS analysis 2''-IA-299-AB inside containment penetration S-5B
Morton, D.K.
September 12, 1978
Primary view of Analysis of debris vacuumed from K-Reactor tank
Baumann, E. W.
January 20, 1992
Primary view of FFTF operating and administrative index
unknown creator
October 15, 1976
Back to Top of Screen