Search Results

Advanced search parameters have been applied.
Primary view of Reactor containment analysis for BWR suppression systems. Progress report, April--October 1977
Edwards, L.L.
December 14, 1977
Primary view of Argonne Code Center: benchmark problem book
unknown creator
June 1, 1977
Primary view of Effects of a hypothetical loss-of-coolant accident on a Mark I Boiling Water Reactor pressure-suppression system
Pitts, J.H. & McCauley, E.W.
December 22, 1977
Primary view of Finite-difference methods in multi-dimensional two-phase flow. [BWR; PWR; LMFBR]
Travis, J. R.
January 1, 1977
Primary view of Non-equilibrium aspects of water reactor safety
Jones, O.C. Jr. & Saha, P.
July 1, 1977
Primary view of Results from the 1/5-scale Mark I BWR pressure suppression experiment
Pitts, J.H. & McCauley, E.W.
October 14, 1977
Primary view of Reports distributed under the NRC Light-Water Reactor Safety Research Foreign Technical Exchange Program. Volume III, January--June 1977
Sharp, D. S. & Cottrell, W. B.
September 19, 1977
Primary view of WRAP: user convenient relap code package. [BWR; PWR]
Anderson, M.M.
January 1, 1977
Primary view of Effects of torus wall flexibility on forces in the Mark I Boiling Water Reactor Pressure Suppression System. Part I
Martin, R. W. & McCauley, E. W.
September 1, 1977
Primary view of Mark I 1/5-scale boiling water reactor pressure suppression experiment. Quick-look report for test numbers 1. 1, 1. 2, and 1. 3 performed on March 18, 25, and 30, 1977
McCauley, E. W. & Pitts, J. H.
April 22, 1977
Primary view of High-temperature deformation and rupture behavior of internally-pressurized Zircaloy-4 cladding in vacuum and steam enivronments. [LOCA conditions]
Chung, H. M.; Garde, A. M. & Kassner, T. F.
January 1, 1977
Primary view of Mark I 1/5-sale boiling water reactor pressure suppression experiment quick-look report
Lai, W. & Collins, E. K. (comps.)
June 3, 1977
Primary view of Reactor safety research programs. Quarterly progress report, January 1--March 31, 1977
Romano, A. J. (comp.)
May 1, 1977
Primary view of Mark I 1/5-scale boiling water reactor pressure suppresion experiment quick-look report
Lai, W. & Collins, E. K. (comps.)
May 24, 1977
Primary view of Cable tray fire tests. [BWR; PWR]
Klamerus, L. J. & Nilson, R. H.
January 1, 1977
Primary view of Light water reactor safety research program quarterly report, July--September 1976. [Molten core-concrete interactions]
Dahlgren, D. A.
March 1, 1977
Primary view of Decay heat measurements by fast-response boil-off calorimetry. [BWR; PWR]
Yarnell, J. L. & Bendt, P. J.
January 1, 1977
Primary view of Numerical solution of one dimensional two-phase drift flux equations with a blend of partially and fully implicit methods. [BWR; PWR]
Mahaffy, J. H. & Liles, D. R.
January 1, 1977
Primary view of Preliminary model for core/concrete interactions. [PWR and BWR]
Murfin, W. B.
August 1, 1977
Primary view of Reactor primary coolant system pipe rupture study. Progress report No. 38, October--December 1976. [BWR]
unknown creator
February 1, 1977
Primary view of Light-water-reactor safety research program. Quarterly progress report, October--December 1976
Sachs, R. G. & Kyger, J. A.
March 1, 1977
Primary view of Radiation signature folowing the hypothesized LOCA. [BWR; PWR]
Bonzon, L. L.
September 1, 1977
Primary view of Summary of calculations of dynamic response characteristics and design stress of the 1/5 scale PSE torus. [BWR; MK1 pressure suppression system]
Arthur, D.
February 9, 1977
Primary view of Steam explosion triggering experiments with oxidized Corium-E simulants. [BWR; PWR]
Nelson, L. S. & Buxton, L. D.
January 1, 1977
Back to Top of Screen