Search Results

Primary view of Status Report on the Argonne Advanced Research Reactor
Lennox, D. H.; Barts, E. W.; Batch, R. V.; Beyer, F. C.; Jorgensen, G. L.; Kelber, C. N. et al.
November 1, 1961
Primary view of The Snap Ii Power Conversion System Topical Report No. 12. Boiler Development
Gido, R. G.; Koestel, A.; Haller, H. C.; Huber, D. D. & Deibel, D. L.
July 17, 1961
Primary view of Low cost Czochralski crystal growing technology: near term implementation of the flat plate photovoltaic cost reduction of the Low Cost Solar Array Project. Fifth quarterly progress report, April 1-June 30, 1980
Roberts, E. G.
January 1, 1980
Primary view of Review of tribological sinks in six major industries
Imhoff, C. H.; Brown, D. R.; Hane, G. J.; Hutchinson, R. A.; Erickson, R.; Merriman, T. et al.
September 1, 1985
Primary view of Studies of photosynthetic energy conversion. Comprehensive three-year report, September 1, 1972--August 31, 1975
Clayton, R. K.
January 1, 1975
Primary view of Brookhaven highlights for fiscal year 1991, October 1, 1990--September 30, 1991
Rowe, M.S.; Cohen, A.; Greenberg, D.; Seubert, L. & Kuper, J.B.H.
January 1, 1991
Primary view of Geothermal energy impact in Brazoria County. Final report, 15 July 1978-November 30, 1979
Horine, B.
June 1, 1980
Primary view of A unified theory of resonant excitation of kinetic ballooning modes by energetic ions/alpha particles in tokamaks
Biglari, H. & Chen, L.
October 1, 1991
Primary view of Magnetic field, closed orbit, and energy measurement in the Bevatron
Crebbin, K. C.
November 1, 1981
Primary view of HVDC-AC system interaction from AC harmonics. Volume 1. Harmonic impedance calculations. Final report
Breuer, G D; Chow, J H; Lindh, C B; Miller, N W; Numrich, F H; Price, W W et al.
September 1, 1982
Primary view of Quantitative analysis of the hydrothermal system in Lassen Volcanic National Park and Lassen Known Geothermal Resource Area
Sorey, M.L. & Ingebritsen, S.E.
January 1, 1984
Primary view of Boron reclamation
Smith, R. M.
July 1, 1980
Primary view of ETRANS: an energy transport system optimization code for distributed networks of solar collectors
Barnhart, J.S.
September 1, 1980
Primary view of Stress analysis of MFTF-B getter system bellows. Final report
Tokarz, F. J.; Johnson, J. J.; Mukherjee, A. N. & Dalder, E. N.
April 1, 1982
Primary view of Review of state-of-the-art of solar collector corrosion processes. Task 1 of solar collector studies for solar heating and cooling applications. Final technical progress report
Clifford, J E & Diegle, R B
April 11, 1980
Primary view of 850/sup 0/C VHTR plant technical description
unknown creator
June 1, 1980
Primary view of Western Gas Sands Project. Status report, 1 May-31 May, 1980
unknown creator
January 1, 1980
Primary view of Modified Purification System Performance Test. Core 1, Seed 2. Test Results T-641124-A. Section 2
unknown creator
July 21, 1961
Primary view of BURNUP DETERMINATION OF NUCLEAR FUELS. Project Report for the Quarter, April 1--June 30, 1968 and Final Report
Lisman, F. L.; Maeck, W. J.; Rein, J. E.; Foster, Jr., R. E.; Abernathey, R. M.; Delmore, Jr., J. E. et al.
March 1, 1969
Primary view of Preparation of Charge Materials for Ornl Electromagnetic Isotope Separators
Sheridan, C W; Gwinn, H R & Love, L O
August 1, 1962
Primary view of WELDING AND BRAZING OF HIGH-TEMPERATURE RADIATORS AND HEAT EXCHANGERS
Slaughter, G.M. & Patriarca, P.
February 20, 1962
Primary view of Microcrystalline silicon growth for heterojunction solar cells. Second quarterly report, 1 April 1983-30 June 1983
Iles, P. A.; Leung, D. C. & Fang, P. H.
January 1, 1983
Primary view of Physical simulations of cavity closure in a creeping material
Sutherland, H.J. & Preece, D.S.
September 1, 1985
Primary view of Mechanical Engineering Department quarterly report, July--September 1977
Stone, R.G. & Bathgate, M.B. (eds.)
September 30, 1977
Back to Top of Screen