Office of Scientific & Technical Information Technical Reports - 4 Matching Results

Search Results

open access

Circumventing chloride ion trouble Columbia River water

Description: This report contains data acquired during sampling of the Columbia River water on March 26, 1945. Topics of discussion include; the elevation of chlorine levels from 4 ppm to 20 ppm, what steps should be taken to remediate the problem, and the various processes that were taken into consideration for the clean up of this chlorine. Separation processes considered include; ion exchange, distillation, precipitation, heat exchange, and recirculation through a cooling tower.
Date: March 26, 1943
Creator: Worthington, H.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen