Interim Data Report on the Geohydrology of the Proposed Waste Isolation Pilot Plant Site, Southeast New Mexico Page: VI
178 p. : ill. ; 28 cm.View a full description of this report.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
Illustrations - Concluded
Page
Figure 20.--Well P-17 construction, completion, and
specifications ----------------------------------- 108
21.--Selected geophysical logs for well P-18 ------------ 116
22.--Well P-18 construction, completion, and
specifications ----------------------------------- 118
23.--Selected geophysical logs for well AEC-8 ----------- 128
24.--Well AEC-8 construction, completion, and
specifications ----------------------------------- 133
25.--Gamma, caliper, and neutron logs of the perforated
intervals in the Bell Canyon Formation -
well AEC-8 --------------------------------------- 134
26.--Radioactive tracer (tracejector) and temperature logs
in the Bell Canyon Formation for well AEC-8 ------ 149
27.--Potentiometric surface of the Culebra Dolomite
Member of Rustler Formation ---------------------- 161
28.--Potentiometric surface of the Magenta Delomite
Member of Rustler Formation ---------------------- 163
29.--Stiff diagrams of chemical characteristics of liquid
from the Rustler-Salado contact ------------------ 165
30.--Stiff diagrams of chemical characteristics of liquid
from the Culebra Dolomite Member of Rustler
Formation --------------------------------------- 167
31.--Stiff diagrams of chemical characteristics of liquid
from the Magenta Dolomite Member of Rustler
Formation ---------------------------------------- 169
32.--Stiff diagram of chemical characteristics of liquid
from the Bell Canyon Formation ------------------- 171VI
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Mercer, J. W. & Orr, B. R. Interim Data Report on the Geohydrology of the Proposed Waste Isolation Pilot Plant Site, Southeast New Mexico, report, July 1979; United States. (https://digital.library.unt.edu/ark:/67531/metadc967923/m1/8/: accessed July 16, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.