A STRUCTURAL INTEGRITY EVALUATION OF THE TANK FARM WASTE TRANSFER SYSTEM Page: 20 of 86
View a full description of this report.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
March, 2006
WSRC-TR-2005-00532
Page 13 of 69Table 4. (cont.)
Core Pipe Jacket Pipe
Item P48 P53 P51 P51A P51B
Leak Testing a) Freon or gas NA NA NA NA
bubble test at 20
psig.
b) Hydrostatic
testing at the
service pressure.
Chloride level in
water must meet
the requirements
of Specification
4482.
Stress Relief Not Required Not Required Not Required Not Required Not RequiredGTAW - Gas Tungsten Arc Welding
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Wiersma, B. A STRUCTURAL INTEGRITY EVALUATION OF THE TANK FARM WASTE TRANSFER SYSTEM, report, March 9, 2006; United States. (https://digital.library.unt.edu/ark:/67531/metadc836317/m1/20/: accessed July 16, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.