Sequence: 92 (standard view) | zoom view

... consultation services to those organizations. Technical support is available to waste generators for sampling... Criteria Manual (iS Manual) for developing a waste classification system for managing each waste type... the waste acceptance criteria (WAC). The 1S Manual requires each generator that delivers waste to treatment...". As indicated above, technical support to waste generators is available from the EMA for sampling activities... involving radioactive wastes. EMA also provides technical review services for waste characterization

Sequence: 94 (standard view) | zoom view

... P2 Program requirements are identified in the WSRC Environmental Compliance Manual (Procedure Manual... of Waste Minimization/Pollution Prevention Program " technical assistance for facility walk-downs

Sequence: 91 (standard view) | zoom view

... legal implications. The SRS Waste Disposal Manual, prepared by ESS, includes a section... on the identification and characterization of hazardous waste. The manual summarizes the applicable federal and state... Disposal Manual provides guidance for waste minimization and environmental training. The ESS issues... Disposal Manual. The manual is updated periodically to incorporate changes in the regulations and add newly... of the Waste Disposal Manual through the WSRC Document Control Section. Environmental Monitoring and Analysis

Sequence: 90 (standard view) | zoom view

... or stream is hazardous or nonhazardous is defined in the WSRC Environmental Compliance Manual (ECM...) Procedure 6.03 as well as the Waste Acceptance Criteria Manual, 1S. The requirements of the ECM... these determinations are provided in the SRS Waste Disposal Manual, WSRC-IM-90-138. By Memoranda of Understanding

Sequence: 80 (standard view) | zoom view

... the preparation of the PSTP required a technical option analysis for inclusion in the STP. As a result... modifications, permit modifications, etc., would be achievable. Performed by Technical personnel from each... treatment and processing facility, along with the engineers and scientists assigned to the technical group... feasible options that received a low score were rejected. Performed by Technical personnel from each... treatment and processing facility, along with the engineers and scientists assigned to the technical group

Sequence: 82 (standard view) | zoom view

... and inexpensive, to technical catastrophes from which recovery, if possible at all, is prolonged and costly. Table...) Small reduction in technical performance 0.5 (moderate) Some reduction in technical performance 0.7... (significant) Degradation in technical performance 0.9 (high) Technical goal cannot be achieved.... Should a preferred treatment option suffer a technical failure, it was postulated that the result would

Sequence: 84 (standard view) | zoom view

.... The process experts' evaluation resulted in a raw technical score for each attribute, and inclusion... not reflect the relative importance of the attributes. The Technical Advisory Committee (TAC), a group... of experienced technical experts with backgrounds in engineering design, environmental protection, process... that not applying a weighting factor to each attribute assigned the same weight to all of them. So, the Technical.... Each option's weighted technical scores were summed. The total fell between 0 (least preferable

Sequence: 85 (standard view) | zoom view

..., the weighted life-cycle cost data were added to the technical weighted score in a way that ensured... using that facility. This resulted in a total weighted score. The IDOA model generated the technical... to pursue the most promising innovative treatment methods. Nonetheless, the technical viability

Sequence: 3 (standard view) | zoom view

..., in paper, from: U.S. Department of Commerce, National Technical Information Service, 5285 Port Royal Road.... Department of Energy, Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831-0062

Sequence: 65 (standard view) | zoom view

... technology and other technical features regarding the identified treatment option. Information is provided... requirements for the treatment option and known external uncertainties of a budgetary, technical

Sequence: 67 (standard view) | zoom view

... units in accordance with applicable technical operating requirements. Certain noncombustive technologies... operated in accordance with the technical operating requirements of 40 CFR Part 264 Subpart O and Part 265

Sequence: 79 (standard view) | zoom view

... of these and other technical assistance documents were provided to the states and their comments incorporated... into the final revision. These documents are available for review. SRS technical personnel developed a method

  • Enclose phrases in quotation marks.
  • Use alternate spellings.
  • Limit or remove special characters and punctuation.

When this item was originally scanned, we used Optical Character Recognition (OCR) technology to "read" and save text embedded in the image. OCR is not fool-proof, however. While the overall quality of the OCR results is generally good, the results may vary depending on legibility of the original materials.

Back to Top of Screen