5.3 Dissolution (Experimental Study) .-.........-.-..-........... 60
5.4 Fission Product Separation (Literature Study)................. 61
5.5 Bibliography for Section 5. . . . . . . . . . . . . . ... . . . . . . . . 61
6. Plutonium Facility Design and Construction.. . .................. 64
6.1 Introduction . ............................. .. . 64
6.2 Health and Safety ..-.-...........................64
6.2.1 Introduction...... .........................64
6.2.2 Background Information......-...-. . . . . . . . ... . . . . 64
6.2.3 Hazard Control......................... .... . 65
6.3 Facility for Fuel Carbide Fabrication and Cold Reprocessing at The Carborundum
Company................. . .. . ........ 66
6.3.1 Laboratory. ........ ... .......... . ". ...... 66
6.3.2 Box Design............ -.-...-.-.- ...-.-... ......66
6.3.3 Box Arrangement..............-...-.- .....-. .. 67
6.3.4 Box Outfitting............ .. ... .... 67
6.3.5 Gas Systems......... ..... . . .......... 69
6.4 Facility for Carbide Evaluation at NDA-.-...............................70
6.4.1 Laboratory . . . . . . . . . 70
6.4.2 Box Design . . . . . . 71
6.4.3 Box Arrangement.....................-.-...-.-.-.-.-. . . 72
6.4.4 Box Outfitting........................................-.-...72
6.4.5 Gas Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . 74
6.4.6 Irradiation Test Design .-. ...........-.-.-.. ......-... 76
6.4.7 Capsule Heater Tests........ .... ........... 79
6.5 References for Section 6........ .... .. ..... ..... 79
7. Appendix. .-.-...................-.-......-...................... 88
7.1 Cost Calculations . . .-..-.-.-.-.-..........88
7.1.1 Net Fuel Material Cost, Cm.....-...--.-.....-....-.....-..-.-.-..89
7.1.2 Fuel Fabrication Cost, Cf ........ . .......... 90
7.1.3 Spent Fuel Processing Cost, Cp . . . . .....91
7.1.4 Fuel Cycle Working Capital Costs. . .. . .......... 93
7.1.5 Fuel Material Lease Charge, C......... .....93
7.1.6 Total Fuel Cost, M...-...-.-.-.-.-.-.-.-. ..... 93
7.1.7 Summary of Costs. ...... ............ . . . . . . 94
7.2 Fission Product Buildup at High Burnup. .... . .... ....... 94
7.3 Chemical Analysis Techniques. . . . . . . . . . . . . . . . . . . . . . . 95
7.3.1 Uranium (Gravimetric Analysis at The Carborundum Company) . . . . . 95
7.3.2 Carbon Analysis................................................95
7.3.3 Nitrogen Analysis .. .. .-...... ... 95
7.3.4 Iron Analysis.......... .... . ....... ..... 95
7.3.5 Proposed Future Methods ....... ... . .......... 96vi
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Bolomey, R.; Lazerus, S.; Sapir, J.; Sofer, G.; Steinmetz, H.; Strasser, A. et al. Carbide Fuel Development: Phase 1 Report, Period of May 15 to September 15, 1959, report, October 15, 1959; Washington D.C.. (https://digital.library.unt.edu/ark:/67531/metadc502678/m1/8/: accessed July 16, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.