Remedial action plan and final design for stabilization of the inactive uranium mill tailings at Green River, Utah: Volume 2A, Appendix D, Supplement, site characterization, Appendix E, Groundwater protection strategy. Final report Page: 3 of 218
View a full description of this report.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
DISCLAIMER
Portions of this document may be illegible in
electronic image products. Images are produced
from the best available original document.
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Remedial action plan and final design for stabilization of the inactive uranium mill tailings at Green River, Utah: Volume 2A, Appendix D, Supplement, site characterization, Appendix E, Groundwater protection strategy. Final report, report, March 1, 1991; United States. (https://digital.library.unt.edu/ark:/67531/metadc1310223/m1/3/: accessed July 16, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.