FY 1995 Remedial Investigation Work Plan for Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee Page: 4 of 51
Medium: P; Size: 40 p.View a full description of this report.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
CONTENTS
FIS.......................................................... v
TABLES........................................................... v
ABBREVIATIONS................................................... vii
EXECUTIVE SUMMARY . ix1. INTRODUCTION .................................................
1.1 PURPOSE AND PROJECT SCOPE ................................
1.2 BACKGROUND ..............................................
1.3 DATA QUALITY OBJECIVES WORKSHOP .......................
1.3.1 Phase I Decisions .........................................
1.3.2 Phase II Decisions ..........................................2. REMEDIAL INVESTIGATION ACTIVITIES FOR WAG 2 IN FY
2.1 CONCEPTUAL MODEL FOR WAG2 ..................
2.2 CURRENT UNDERSTANDING OF WAG 2 .............
2.3 ACTION PLAN ....................................1995
2.4 COMPONENTS OF PROJECT FOR FY 1995 .......................
3. SURFACE WATER ........................
3.1 WATERSHED HYDROLOGY ............
3.2 SEEP ASSESSMENT ....................
3.3 TRIBUTARY ASSESSMENT ..............4. SEDIMENT AND SOILS ...........................................
4.1 SEDIMENT AND SOIL CHARACTERIZATION TASK ................
4.1.1 Soil Characterization Assessment Subtask .........................
4.1.2 IHP Site Radionuclide Inventory Subtask .........................
4.1.3 Bathymetry of White Oak Lake Subtask ..........................
4.1.4 White Oak Lake Coring Subtask ...............................
4.1.5 QA/QC Requirements .......................................
4.1.6 Erosion Rates Subtask .......................................
4.2 SEDIMENT TRANSPORT MODELING TASK ......................
4.2.1 Sediment Transport Simulation Subtask ..........................
4.2.2 Sediment Transport Data Package Subtask ........................
4.2.3 Sediment Transport Storm Sampling Subtask ......................
5. BIOTA ..........................................................
5.1 BIOTA TASK .................................................
5.1.1 Mink and Kingfisher Monitoring Subtask .........................
5.1.2 Soil Toxicity Testing Subtask ...... .........................
5.1.3 Sediment Toxicity Testing Subtask ..............................1
1
3
4
5
6
8
8
8
9
10
12
12
12
13
16
16
16
16
16
18
18
19
19
21
22
22
26
26
26
27
28iii
C
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Watkins, D. R. & Herbes, S. E. FY 1995 Remedial Investigation Work Plan for Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee, report, December 1, 1994; Tennessee. (https://digital.library.unt.edu/ark:/67531/metadc1279955/m1/4/: accessed July 16, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.