Multiloop Integral System Test (MIST): Final Report: Searching Inside

We Found:

10 results that matched your query.

Page: 4-2 (standard view) | zoom view

... and manual interactions during the test transients were acceptable for all the tests except as noted below..., and Test 3009AA was terminated at 236 minutes, as a result of manual actuation of the PORV due to excessive

Page: Front index (standard view) | zoom view

..., U.S. Government Printing Office, P.O. Box 37082, Washington, DC 20013-7082 3. The National Technical... Issuances. Documents available from the National Technical Information Service include NUREG series reports... and technical reports prepared by other federal agencies and reports prepared by the Atomic Energy Commission..., forerunner agency to the Nuclear Regulatory Commission. Documents available from public and special technical

  • Enclose phrases in quotation marks.
  • Use alternate spellings.
  • Limit or remove special characters and punctuation.

When this item was originally scanned, we used Optical Character Recognition (OCR) technology to "read" and save text embedded in the image. OCR is not fool-proof, however. While the overall quality of the OCR results is generally good, the results may vary depending on legibility of the original materials.

Back to Top of Screen