Analysis of the permitting processes associated with exploration of Federal OCS leases. Final report. Volume II. Appendices Page: 87 of 282
Pages: 277View a full description of this report.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
001 C)
EXHIBIT 5 - (Continued)d. Chemical composition of these
additives (see instructions).FOR AGENCY USE
219d NA
Complete Items 20-25 It there Is a thermal discharge
(e.g., associated with a steam and/or oower generation
plant, steel mill, petrel^.sm refinery, or any other
manufacturing process) and the total discharge flow is
10 million gallons per day or more. (see instructions)20. Thermal Discharge Source Check
the appropriate item(s) indicating
the source of the discharge. (sea
Instructions)
Boiler Blowdown
Bolter Chemical Cleaning
Ash Pond Overflnw
Doilcr Water Treatment - Evapora
tor Slowdown
Oil or Coal aired Plants -- Effluent
!rom Air Pollution Control Oeviccs
Condense Cooling Water
Cooling Tower Slowdown
Manufacturing Process
Other
21. Discharge/Receiving Water Temper-
ature Difference
Give the maximum temperature
If ference be.twcen the dscharge
and receiving vwatmrs for summer
and winter operating conditions.
-- (see instructions)
Summer
Winter
22. Discharge Temperature, Rate of
Change Per Hour
Give the maximum possible rate of
temperature change per hour of
discharge under operating con-
ditions. (see instructions)
23. Water Temperature, Percentile
Report (Frequency of Occurrence)
In the tiOle below, enter the
temperature which is exceeded I0%
of the year, 5 a of the year, 1% of
the year and not at all (maximum
yearly temperature). (see instructions)
Pf~ruency of occutrence
a. Intake Water Temperature
(Supcct to natur: changes)
b. Discharge Water Temperature
24. Water Intake Velocity
(see Instructions)
25. Retention Time Give the length of
time, irs minutes, from start of
water temperature rise to discharge
of cooling water. (see Instructions)220
22 t3
221, i
Z21 b
222
223a
223b,
224
225EPA Farm 75:-023 (7-73)
NA
OBCCL
OAPOF
0 CPSO
OOCFP
0CONO
SCTBO
O MFPR
0 OTH A
1::.
OF.
NAM -OF./hour
NA10% 5%/ 1% Maximum
OF of of of
OF of of OFNA feet/sec.
II-8
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Analysis of the permitting processes associated with exploration of Federal OCS leases. Final report. Volume II. Appendices, report, November 1, 1980; United States. (https://digital.library.unt.edu/ark:/67531/metadc1184664/m1/87/: accessed July 16, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.