80" Bubble Chamber Expansion System Preliminary Operating Procedures Page: 2
View a full description of this report.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
-2-
Procedures for boot valve disassemblies during
6.
7.
8.
e
Procedures for solenoid valve disassemblies during
operation •
Suggested procedures for the initial operation.
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Goodzeit, C. L. 80" Bubble Chamber Expansion System Preliminary Operating Procedures, report, January 7, 1964; Washington D.C.. (https://digital.library.unt.edu/ark:/67531/metadc1255939/m1/3/: accessed May 9, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.