Search Results

Primary view of Plasma measurements with surface barrier detectors
Futch, A. H. Jr. & Bradley, A. E.
January 27, 1969
Primary view of Characterization of commercial aluminate, silicate, and Zero-X materials
Gurwell, W. E.
January 27, 1966
Primary view of Evaluation of tensile specimen types used for uranium
Burditt, R. B.
June 27, 1963
Primary view of Radiation Damage in Nb and Ta
DeFord, John W.
February 27, 1968
Primary view of Control of information on Columbia River
Johnson, W. E.
December 27, 1962
Primary view of Design and Analysis of the Experimental Gas-Cooled Reactor Fuel Assemblies
Samuels, G.
September 27, 1963
Primary view of Hanford Reactor and Separations Facility Advantages
unknown creator
June 27, 1963
Primary view of Behavior of Fission Products Released Into a Steam-Air Atmosphere From Overheated UO {Sub 2} Previously Irradiated to 20,000 MWD/T (Nuclear Safety Pilot Plant Run No. 14, Part I)
Parsly, L. F. & Row, T. H.
September 27, 1967
Primary view of Alloying Characteristics of the Rare Earth Elements with the Transition Elements
Sheely, W. F.
May 27, 1963
Primary view of Release of radioactivity to the Columbia River from irradiated fuel element ruptures
Jerman, P. C.; Koop, W. N. & Owen, F. E.
May 27, 1965
Primary view of Comparative reactor flux spectra
Gumprecht, R. O.
November 27, 1963
Primary view of NPR Reactor shield calculations
Peterson, E. G.
September 27, 1961
Primary view of Irradiation test data for production test IP-149-D, irradiation service request HAPO-215, the irradiation of uranium dioxide
Marshall, R. K.
February 27, 1961
Primary view of GEH-4-68, 69, 70: Proposal for variable braze thickness irradiation
Tverberg, J. C. & Kusler, L. E.
June 27, 1961
Primary view of N-Reactor co-product target element rupture detection study
Allred, D. O.
April 27, 1964
Primary view of Revised code words
Jaynes, R. E.
October 27, 1961
Primary view of Attenuation effectiveness of the Hanford reactor iron masonite shields
Smalley, W. L.
April 27, 1960
Primary view of Chemical decontamination of Hanford production reactors
Hauff, T. W.; Jensen, H. F. & Smith, R. H.
June 27, 1963
Primary view of Plutonium production history
Plum, R. L.
March 27, 1968
Primary view of Basis for design scope: Plutonium Reclamation Facility, Z Plant, Project CAC-880
Braden, D. E.
April 27, 1960
Primary view of Production test IP-310-A-FP, determination of the dimensional stability of uranium fuel cores classified by the fuel core tester (UT-2)
Clinton, M. A.
April 27, 1961
Primary view of Nuclear safety experience -- Hanford production reactors
Greager, O. H.
August 27, 1963
Primary view of Design of supplement A to production test IP-183-A-98-FP evaluation of projection fuel elements in K process tubes
Hodgson, W. H. & Clinton, M. A.
July 27, 1961
Primary view of Fission product security problem
Warren, J. H.
February 27, 1964
Back to Top of Screen